Free Time and Work MCQs with Answers

120 Time and Work MCQs from Mathematics, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

Problems measure work through rates, treating each person's or machine's contribution as work completed per unit time. Questions cover combined work, efficiency, wages, alternate working schedules, pipes and cisterns, and men-days relationships, with care needed to distinguish time taken by one worker from the time required when workers act together.

Last updated

120 questions · page 3 of 6

  • A. 30 days
  • B. 25 days
  • C. 20 days
  • D. 15 days

Explanation: Let Q's rate be q and R's rate be 1/50. Since P can do the work in the same time as Q and R together, P's rate is q + 1/50. Also P+Q has rate 1/10, so 2q + 1/50 = 1/10, giving q = 1/25 and a time of 25 days. The likely mistake is 30 days, which can result from ignoring that P's rate already includes Q's and R's combined rate.

Correct answer: 25 days
  • A. 5,750 litres
  • B. 5,760 litres
  • C. 6,890 litres
  • D. None of these

Explanation: Let the tank capacity be V litres. The leak removes V/6 litres per hour, while the inlet supplies 4 litres per minute = 240 litres per hour; when both operate, the net emptying rate is V/8 litres per hour. Hence V/6 - 240 = V/8, so V(1/6 - 1/8) = 240 and V/24 = 240, giving V = 5,760 litres. The likely mistake is 5,750 litres, caused by inaccurate subtraction or division.

Correct answer: 5,760 litres
  • A. 12 min
  • B. 14 min
  • C. 16 min
  • D. 20 min

Explanation: The filling rate is 1/32 tank per minute and the emptying rate is 1/16 tank per minute, so the net rate is 1/32 - 2/32 = -1/32 tank per minute. Starting with half a tank, the time to empty it is (1/2) / (1/32) = 16 minutes. The likely mistake is 12 minutes, which does not account correctly for the half-tank starting amount and the net rate.

Correct answer: 16 min
  • A. 20 days
  • B. 30 days
  • C. 40 days
  • D. none of these

Explanation: The pair rates are A+B = 1/12, B+C = 1/15, and C+A = 1/20. Adding them gives 2(A+B+C) = 1/12 + 1/15 + 1/20 = 1/5, so the total rate is 1/10; A's rate is 1/10 - 1/15 = 1/30. Therefore A alone needs 30 days. The likely mistake is 20 days, which confuses the time of a pair with the time of A alone.

Correct answer: 30 days
  • A. 4
  • B. 9.6
  • C. 9
  • D. 10

Explanation: A's rate is 1/16 and B's rate is 1/12, so their combined rate is 7/48 work per day. Since A, B, and C together work at 1/4 = 12/48, C's rate is 12/48 - 7/48 = 5/48, giving C's time as 48/5 = 9.6 days. The likely mistake is 9 days, which comes from rounding the exact result incorrectly.

Correct answer: 9.6
  • A. 2
  • B. 8
  • C. 10
  • D. 12

Explanation: The original labour is 10 bulls x 3 days x 10 hours = 300 bull-hours for 20 fields, or 15 bull-hours per field. For 32 fields, the work is 32 x 15 = 480 bull-hours; 30 bulls working 8 hours daily provide 240 bull-hours per day, so the time is 480/240 = 2 days. The likely mistake is 8 days, which fails to adjust for both the increased number of bulls and the shorter working day.

Correct answer: 2
  • A. 2
  • B. 3 3⁄7
  • C. 4 ¼
  • D. 5

Explanation: Their combined daily rate is 1/24 + 1/6 + 1/12 = 1/24 + 4/24 + 2/24 = 7/24 work per day. Therefore the time is 1 / (7/24) = 24/7 = 3 3/7 days. The likely mistake is 4 1/4 days, which may come from adding the completion times rather than the rates.

Correct answer: 3 3⁄7
  • A. 2 min
  • B. 3 min
  • C. 4 min
  • D. 5 min

Explanation: If Q is closed after t minutes, P works for all 9 minutes and Q works for t minutes. The filled fraction is 9/12 + t/16 = 1, so 3/4 + t/16 = 1 and t/16 = 1/4, giving t = 4 minutes. The likely mistake is 3 minutes, which does not provide enough contribution from Q to complete the remaining quarter of the tank.

Correct answer: 4 min
  • A. 12/6 days
  • B. 15/2 days
  • C. 23 days
  • D. 34 days

Explanation: A's rate is 1/12 work per day. B is 60% more efficient, so B's rate is 1.6 x 1/12 = 1/7.5 work per day, and B's time is 12/1.6 = 7.5 days = 15/2 days. The likely mistake is 12/6 days, which treats 60% more efficiency as doubling the efficiency.

Correct answer: 15/2 days
  • A. 70 days
  • B. 120/7 days
  • C. 50 days
  • D. 45 days

Explanation: A's rate is 1/30 work per day and B's rate is 1/40 work per day, so together their rate is 1/30 + 1/40 = 7/120 work per day. Therefore, time = 1 ÷ (7/120) = 120/7 days. The likely trap is 70 days, from adding the individual times instead of their rates.

Correct answer: 120/7 days
  • A. 5
  • B. 6
  • C. 7
  • D. 8

Explanation: B completes 9/24 = 3/8 of the work in 9 days, so A and B together complete 5/8 of the work. Their combined rate is 1/21 + 1/24 = 5/56 work per day, giving time = (5/8) ÷ (5/56) = 7 days. The likely mistake is choosing 6 days by using an incorrect combined rate.

Correct answer: 7
  • A. 13
  • B. 11
  • C. 12
  • D. 15

Explanation: A completes 2 × 1/8 = 1/4 of the work, leaving 3/4; B then completes 2/3 × 3/4 = 1/2, leaving 1/4. B takes (1/2) ÷ (1/14) = 7 days and C takes (1/4) ÷ (1/16) = 4 days, so total time is 2 + 7 + 4 = 13 days. The likely trap is 11 days, caused by misreading B's share of the remaining work.

Correct answer: 13
  • A. 20
  • B. 25
  • C. 125
  • D. 60

Explanation: The number of tasks is proportional to the number of men and working hours, so tasks = 50 × (10 men × 6 hours) ÷ (6 men × 4 hours) = 125 tasks. This uses total man-hours, not just the increase in the number of men. The likely mistake is choosing 60 tasks by scaling only one factor.

Correct answer: 125
  • A. 1
  • B. 2
  • C. 3
  • D. 4

Explanation: Q's rate is 1/12 work per day, and P works twice as fast, so P's rate is 2/12 = 1/6 work per day. Their combined rate is 1/12 + 1/6 = 1/4 work per day, so they finish in 1 ÷ 1/4 = 4 days. The likely trap is 2 days, from doubling Q's speed without adding Q's contribution.

Correct answer: 4
  • A. 9
  • B. 11
  • C. 23
  • D. 13

Explanation: P's rate is 1/23 work per day; since P is 30% more efficient, Q's rate is 1/1.3 of P's rate = 10/299 work per day. Together their rate is 1/23 + 10/299 = 13/299 + 10/299 = 23/299 work per day, so time = 299/23 = 13 days. The likely mistake is 23 days, which ignores Q's contribution.

Correct answer: 13
  • A. 4 days
  • B. 6 days
  • C. 2 days
  • D. 8 days

Explanation: The first group represents 10 × (6m + 8w) man-woman units, while the second represents 2 × (26m + 48w); equating them gives 60m + 80w = 52m + 96w, so m = 2w. The total work is therefore 10 × (6 × 2 + 8) = 200 units, and 15 men plus 20 women complete 15 × 2 + 20 = 50 units per day, taking 200 ÷ 50 = 4 days. The likely trap is 2 days, from comparing the group sizes without finding individual efficiencies.

Correct answer: 4 days
  • A. 10 min
  • B. 20 min
  • C. 30 min
  • D. 40 min

Explanation: The two inlet taps fill at 1/12 + 1/15 = 3/20 cistern per minute, while the net rate with the outlet open is 1/20 cistern per minute. Thus the outlet rate is 3/20 - 1/20 = 1/10 cistern per minute, so it empties the cistern in 10 minutes. The likely mistake is 20 minutes, which treats the net filling time as the outlet's emptying time.

Correct answer: 10 min
  • A. 5 min
  • B. 10 min
  • C. 15 min
  • D. 20 min

Explanation: The combined filling rate is 1/20 + 1/15 + 1/12 = 3/60 + 4/60 + 5/60 = 12/60 = 1/5 cistern per minute. Therefore, the three pipes fill the cistern in 5 minutes. The likely trap is 10 minutes, from combining only two of the pipes or averaging their times.

Correct answer: 5 min
  • A. 35 Rs.
  • B. 40 Rs.
  • C. 45 Rs.
  • D. None of these

Explanation: A and B have rates 1/10 and 1/15 work per day, whose ratio is 3:2, so A deserves 3/5 of the wages. A's share is (3/5) × Rs.75 = Rs.45. The likely mistake is Rs.35, which does not follow the correct 3:2 rate ratio.

Correct answer: 45 Rs.
  • A. 30 days
  • B. 25 days
  • C. 24 days
  • D. 20 days

Explanation: Equalising the total work gives 4(2m + 12w) = 5(4m + 6w), so 8m + 48w = 20m + 30w and m = 3w/2. The job equals 4(2 × 3w/2 + 12w) = 60w units, while one man and one woman work at 3w/2 + w = 5w/2 units per day, so time = 60w ÷ 5w/2 = 24 days. The likely trap is 20 days, from failing to solve the man-to-woman efficiency ratio.

Correct answer: 24 days