Free Time and Work MCQs with Answers
120 Time and Work MCQs from Mathematics, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.
Problems measure work through rates, treating each person's or machine's contribution as work completed per unit time. Questions cover combined work, efficiency, wages, alternate working schedules, pipes and cisterns, and men-days relationships, with care needed to distinguish time taken by one worker from the time required when workers act together.
Last updated
120 questions · page 4 of 6
- A. 3/5
- B. 4/7
- C. 2/5
- D. 1/4
Explanation: Their combined rate is 1/15 + 1/12 = 3/20 work per day, so in 4 days they complete 4 × 3/20 = 3/5 of the work. The fraction left is 1 - 3/5 = 2/5. The likely mistake is 3/5, which is the fraction completed rather than the fraction remaining.
Correct answer: 2/5- A. 48
- B. 34(2/7)
- C. 44
- D. 45
Explanation: Using pairwise rates, 2A = (A+B) + (A+C) - (B+C) = 1/20 + 1/40 - 1/30 = 1/24 work per day, so A's rate is 1/48 work per day. Hence A alone takes 48 days. The likely trap is 44 days, caused by combining the three pair rates incorrectly.
Correct answer: 48- A. 10
- B. 8
- C. 18
- D. 19
Explanation: The rate of all three together is [(1/30) + (1/24) + (1/20)] ÷ 2 = 1/16 work per day, so in 10 days they complete 5/8 and leave 3/8. P's rate is [(1/30) + (1/20) - (1/24)] ÷ 2 = 1/48 work per day, so P needs (3/8) ÷ (1/48) = 18 more days. The likely trap is 10 days, which ignores the work left after the first 10 days.
Correct answer: 18- A. 5 5⁄11
- B. 4 5⁄11
- C. 6 4⁄11
- D. 6 5⁄11
Explanation: A completes 12 days × 8 hours = 96 hours of work, so A's hourly rate is 1/96 work per hour; B's is 1/(8 × 10) = 1/80 work per hour. Working together for 8 hours per day, their daily rate is 8/96 + 8/80 = 11/60 work per day, giving time = 60/11 = 5 5/11 days. The likely mistake is 4 5/11 days, from combining daily rates without accounting for the stated working hours.
Correct answer: 5 5⁄11- A. Rs. 380
- B. Rs. 600
- C. Rs. 420
- D. Rs. 400
Explanation: A and B together work at 1/6 + 1/8 = 7/24 of the job per day, so in 3 days they complete 21/24 = 7/8 and C completes the remaining 1/8. C's payment is therefore (1/8) × Rs.3200 = Rs.400. The likely trap is Rs.600, which overestimates C's share by not calculating the work completed by A and B.
Correct answer: Rs. 400- A. 5 hrs
- B. 10 hrs
- C. 15 hrs
- D. 20 hrs
Explanation: Let the slower pipe take t hours, so the faster takes t - 5 hours. Since together they fill 1/6 cistern per hour, 1/t + 1/(t - 5) = 1/6, which gives t² - 17t + 30 = 0 and the valid root t = 15 hours. The likely mistake is 10 hours, from treating the 5-hour difference as a direct part of the combined time.
Correct answer: 15 hrs- A. 7.5 hrs
- B. 5 hrs
- C. 7 hrs
- D. None of these
Explanation: The net rate is 1/10 + 1/12 - 1/20 = 6/60 + 5/60 - 3/60 = 8/60 = 2/15 tank per hour. Therefore, filling time = 1 ÷ (2/15) = 15/2 = 7.5 hours. The likely trap is 5 hours, which adds the inlet rates but forgets to subtract the emptying rate.
Correct answer: 7.5 hrs- A. 42/4 days
- B. 41/4 days
- C. 55 days
- D. None of these
Explanation: In each two-day cycle, A and B complete 1/9 + 1/12 = 7/36 of the work. After four cycles, 28/36 = 7/9 is complete; A then works on day 9, B on day 10, and the remaining 1/36 is completed by A in (1/36) ÷ (1/9) = 1/4 day, giving 10 1/4 = 41/4 days. The likely mistake is 42/4 days, caused by rounding the final quarter-day or mishandling the alternating sequence.
Correct answer: 41/4 days- A. 15 days
- B. 10 days
- C. 8 days
- D. 20 days
Explanation: The complete work rate of 4 men and 2 women is 1/2 work per day. Two men complete 1/5 work per day, so 4 men complete 2/5 work per day; therefore 2 women complete 1/2 - 2/5 = 1/10 work per day and need 10 days. The likely trap is 15 days, which results from subtracting the rates incorrectly.
Correct answer: 10 days- A. 32 hours
- B. 48 hours
- C. 3 days
- D. 4 days
Explanation: If A works at x work per day, B works at 3x work per day, so together they work at 4x = 1 work per day. Thus B's rate is 3/4 work per day, giving B a time of 1 ÷ 3/4 = 4/3 days = 32 hours. The likely mistake is choosing 48 hours by treating B's rate as half the combined rate instead of three-fourths.
Correct answer: 32 hours- A. 4(2/3) days
- B. 4 days
- C. 5(1/3) days
- D. 1(1/3) days
Explanation: The three pair rates are 1/6, 1/12 and 1/8 work per day. Their sum is 3/8 work per day, which counts each person's rate twice, so the combined rate of A, B and C is 3/16 work per day and their time is 16/3 = 5 1/3 days. The likely trap is 4 days, caused by adding the pair rates without dividing by 2.
Correct answer: 5(1/3) days- A. 6 days
- B. 10 days
- C. 15 days
- D. 20 days
Explanation: X completes 4 x 1/20 = 1/5 of the work in the first 4 days, leaving 4/5 of the work. After Y joins, their combined rate is 1/20 + 1/12 = 2/15 work per day, so the remaining work takes (4/5) ÷ (2/15) = 6 days; the total duration is 4 + 6 = 10 days. The likely trap is 6 days, which counts only the period after Y joined.
Correct answer: 10 days- A. 3 : 4
- B. 4 : 3
- C. 5 : 3
- D. Data inadequate
Explanation: The same work equals 20 women x 16 days = 320 woman-days and 16 men x 15 days = 240 man-days. Therefore one man's capacity compared with one woman's capacity is 320/240 = 4/3, so the ratio is 4:3. The likely trap is 3:4, which reverses the requested order of man's capacity to woman's capacity.
Correct answer: 4 : 3- A. 80 days
- B. 100 days
- C. 120 days
- D. 150 days
Explanation: Using pair rates, A's rate is (AB + AC - BC)/2 = (1/72 + 1/90 - 1/120)/2 = (1/60)/2 = 1/120 work per day. Therefore A alone takes 120 days. The likely trap is 100 days, caused by combining the pair times directly instead of combining their rates.
Correct answer: 120 days- A. 8 days
- B. 10 days
- C. 12 days
- D. 15 days
Explanation: Together A and B complete 1/15 + 1/10 = 1/6 work per day, so in 2 days they complete 1/3 of the work. The remaining 2/3 takes (2/3) ÷ (1/15) = 10 days for A alone, making the total 2 + 10 = 12 days. The likely trap is 10 days, which omits the first 2 days of joint work.
Correct answer: 12 days- A. 15 days
- B. 20 days
- C. 25 days
- D. 30 days
Explanation: The condition says A's rate equals B plus C's rate. Since A and B together work at 1/10 work per day and C works at 1/50 work per day, 1/10 = 2B + 1/50, so B's rate is (1/10 - 1/50) ÷ 2 = 1/25 work per day. Hence B alone takes 25 days; the likely trap is 20 days, from failing to divide the remaining rate by 2.
Correct answer: 25 days- A. 160
- B. 175
- C. 180
- D. 195
Explanation: A regular four-week schedule has 5 x 8 x 4 = 160 regular hours, earning 160 x Rs. 2.40 = Rs. 384. The remaining Rs. 432 - Rs. 384 = Rs. 48 represents 48 / Rs. 3.20 = 15 overtime hours, so total work is 160 + 15 = 175 hours; option c usually comes from treating all hours as overtime.
Correct answer: 175- A. 3
- B. 4
- C. 5
- D. 6
Explanation: The loss in wages equals the number of absent days multiplied by the daily wage: Rs. 4956 - Rs. 3894 = Rs. 1062. The daily wage is Rs. 4956 ÷ 14 = Rs. 354, so absent days = Rs. 1062 ÷ Rs. 354 = 3 days. The likely mistake is option b, 4 days, which would imply an incorrect daily wage.
Correct answer: 3- A. 39
- B. 40
- C. 37
- D. 35
Explanation: The daily wage is found from the contract total: Rs. 1189 ÷ 41 days = Rs. 29 per day. The actual working days are Rs. 1073 ÷ Rs. 29 = 37 days. The likely mistake is option b, 40 days, which would give Rs. 1160, not Rs. 1073.
Correct answer: 37- A. 4.5 hrs
- B. 5 hrs
- C. 6.5 hrs
- D. 7.2 hrs
Explanation: The filling rate is 1/4 tank per hour and the emptying rate is 1/9 tank per hour, so the net rate is 1/4 - 1/9 = 5/36 tank per hour. The time required is 1 divided by 5/36 = 36/5 = 7.2 hours. The likely mistake is choosing 4.5 hours by combining the times directly instead of subtracting the rates.
Correct answer: 7.2 hrs