A and B can do a piece of work in 12 days; B and C in 15 days; C and A in 20 days. A alone can do the work in__________?
Correct answer: B. 30 days
- A. 20 days
- B. 30 days
- C. 40 days
- D. none of these
Explanation
The pair rates are A+B = 1/12, B+C = 1/15, and C+A = 1/20. Adding them gives 2(A+B+C) = 1/12 + 1/15 + 1/20 = 1/5, so the total rate is 1/10; A's rate is 1/10 - 1/15 = 1/30. Therefore A alone needs 30 days. The likely mistake is 20 days, which confuses the time of a pair with the time of A alone.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Time and Work
Problems measure work through rates, treating each person's or machine's contribution as work completed per unit time. Questions cover combined work, efficiency, wages, alternate working schedules, pipes and cisterns, and men-days relationships, with care needed to distinguish time taken by one worker from the time required when workers act together.
Practise Arithmetic
1,060 free Arithmetic MCQs from Mathematics, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Mathematics questions like this
Mathematics is on 76 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Time and Work questions
A tap can fill a tank in 32 min. and another can empty it in 16 min. If the tank is already half full and both the tanks are opened together, the tank will be_________?
A leak in the bottom of a tank can empty the full tank in 6 hrs. An inlet pipe fills water at the rate of 4 lit. a minute. When the tank is full, the inlet is opened and due to the leak, the tank is empty in 8 hrs. The capacity of the tank in liters is_________?
P can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in__________?
A can lay a railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in_________?
If 10 bulls can plough 20 identical fields in 3 days working 10 hours a day, then in how many days can 30 bulls plough 32 same identical fields working 8 hours a day?
P, Q and R can complete a work in 24, 6 and 12 days respectively. The work will be completed in________days if all of them are working together.