Free Power Systems MCQs with Answers

334 Power Systems MCQs from Electrical Engineering, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

Last updated

334 questions · page 6 of 17

  • A. 0.5 lagging
  • B. 0.5 leading
  • C. 0.95 lagging
  • D. 0.95 leading

Explanation: A consumer generally operates most economically at a high power factor, commonly taken as about 0.95 lagging.

Correct answer: 0.95 lagging
  • A. High maintenance cost
  • B. Continuous losses in motor
  • C. Noise
  • D. All of the above

Explanation: A synchronous condenser has rotating parts, so it requires more maintenance, produces continuous motor losses, and may create operating…

Correct answer: All of the above
  • A. at the receiving end
  • B. at the sending end
  • C. either A. or (b)
  • D. none of the above

Explanation: Reactive-power compensation is most effective when installed near the receiving end or load, where it reduces the reactive current carried…

Correct answer: at the receiving end
  • A. Phase advancers
  • B. Synchronous compensators
  • C. Static capacitors
  • D. Any of the above

Explanation: Phase advancers, synchronous compensators, and static capacitors all supply or reduce the reactive power demanded by inductive loads.

Correct answer: Any of the above
  • A. It should run at high speed
  • B. It should produce high voltage
  • C. It should be small in size
  • D. It should be capable of starting quickly

Explanation: A peak-load plant operates for short periods and must respond rapidly when demand rises.

Correct answer: It should be capable of starting quickly
  • A. Nuclear power plant
  • B. Steam turbine plant
  • C. Pumped storage plant
  • D. None of the above

Explanation: Pumped-storage plants store energy during off-peak periods and release it rapidly during demand peaks, making them particularly suited to…

Correct answer: Pumped storage plant
  • A. Thermal power plant
  • B. Diesel power plant
  • C. Nuclear power plant
  • D. Hydro-electric power plant

Explanation: Diesel power plants use compact, modular generating units and can be installed comparatively quickly.

Correct answer: Diesel power plant
  • A. diesel power plants
  • B. nuclear power plants
  • C. hydro-electric power plants
  • D. thermal power plants

Explanation: Large thermal plants commonly consume huge quantities of coal or other fuel, making fuel transport a major logistical problem.

Correct answer: thermal power plants
  • A. Diesel engine plant
  • B. Nuclear power plant
  • C. Gas turbine plant
  • D. Pumped storage plant

Explanation: Nuclear plants have high capital cost, low running cost, and are best operated continuously, so they are normally assigned base load.

Correct answer: Nuclear power plant
  • A. firm power
  • B. cold reserve
  • C. hot reserve
  • D. spinning reserve

Explanation: Spinning reserve is generating capacity already synchronized with and connected to the bus bars, so it can accept load immediately.

Correct answer: spinning reserve
  • A. positive
  • B. negative
  • C. zero
  • D. any of the above

Explanation: Salvage value depends on the plant's remaining value and disposal cost: it may be positive, zero, or effectively negative when dismantling…

Correct answer: any of the above
  • A. Exhaust fan
  • B. Lathe machine
  • C. Welding transformer
  • D. All of the above

Explanation: A welding transformer produces a fluctuating load because the welding arc is repeatedly struck, interrupted, and varied during operation.

Correct answer: Welding transformer
  • A. peak load plant
  • B. base load plant
  • C. stand-by plant
  • D. spinning reserve plant
  • E. any of the above

Explanation: Nuclear stations are designed for continuous operation because their fuel and operating characteristics favour steady generation rather…

Correct answer: base load plant
  • A. sinking fund depreciation
  • B. straight line depreciation
  • C. reducing balances depreciation
  • D. none of the above

Explanation: In the sinking-fund method, interest earned on earlier deposits contributes to the required depreciation fund, so the annual deposit…

Correct answer: sinking fund depreciation
  • A. fixed charges
  • B. semi-fixed charges
  • C. running charges
  • D. all of the above

Explanation: The annual cost of operating a power plant is divided into fixed charges, semi-fixed charges, and running charges.

Correct answer: all of the above
  • A. equal to unity
  • B. less than unity
  • C. more than unity
  • D. none of the above

Explanation: Utilization factor is the ratio of maximum demand to the plant's rated capacity.

Correct answer: more than unity
  • A. nuclear power plant
  • B. hydro power plant
  • C. diesel power plant
  • D. both B and C
  • E. none of the above

Explanation: Diesel and hydroelectric plants can be brought into service very quickly, unlike nuclear plants, which require lengthy starting and…

Correct answer: both B and C
  • A. diesel engine
  • B. hydraulic turbine
  • C. gas turbine
  • D. steam turbine
  • E. any of the above

Explanation: Generating stations may use diesel engines, hydraulic turbines, gas turbines, or steam turbines as their prime movers, depending on the…

Correct answer: any of the above
  • A. dependent upon the energy consumed
  • B. dependent upon the maximum demand of the consumer
  • C. both A and B
  • D. neither A nor B

Explanation: In a two-part or Hopkinson tariff, the demand charge is based on the consumer's maximum demand, usually measured in kW or kVA.

Correct answer: dependent upon the maximum demand of the consumer
  • A. the capital cost divided by number of year of life
  • B. the capital cost minus the salvage value, is divided by the number of years of life
  • C. increasing a uniform sum of money per annum at stipulated rate of interest
  • D. none of the above

Explanation: Straight-line depreciation spreads the depreciable amount uniformly over the plant life.

Correct answer: the capital cost minus the salvage value, is divided by the number of years of life