Which of the following power plants need the least period for installation ?

Correct answer: B. Diesel power plant

  • A. Thermal power plant
  • B. Diesel power plant
  • C. Nuclear power plant
  • D. Hydro-electric power plant

Explanation

Diesel power plants use compact, modular generating units and can be installed comparatively quickly. Thermal, hydroelectric, and nuclear plants require much longer construction and commissioning periods.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

Practise Power Systems

334 free Power Systems MCQs from Electrical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Electrical Engineering questions like this

Electrical Engineering is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Power Systems questions