Free Logical Problems MCQs with Answers

520 Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Last updated

Read the Logical Problems notesFree MDCAT chapter notes with key terms

520 questions · page 6 of 26

  • A. 20
  • B. 21
  • C. 22
  • D. 23

Explanation: The pastry chef's rate is 12 cakes in 8 hours, which is 1.5 cakes per hour. The assistant works at 75% of this rate, so his rate is 0.75 * 1.5 = 1.125 cakes per hour. Together, their combined rate is 1.5 + 1.125 = 2.625 cakes per hour. Over the course of 8 hours, they can jointly produce 2.625 * 8 = 21 cakes. Therefore, the correct answer is 21 cakes. The other options are incorrect because they either disregard the assistant's slower rate or miscalculate the combined productivity.

Correct answer: 21
  • A. 9
  • B. 10
  • C. 11
  • D. 12

Explanation: To determine the number of days required, start by calculating the total hours needed to complete 40 brochures: 40 brochures × 2.5 hours per brochure = 100 hours. The designer works 10 hours each day, so divide the total hours by the daily hours: 100 ÷ 10 = 10 days. Therefore, the correct answer is Option B: 10.Option A: 9 and Option C: 11 are incorrect due to miscalculations in either the total hours or the division process. Option D: 12 overestimates the total time needed.

Correct answer: 10
  • A. 8 days
  • B. 9 days
  • C. 9.5 days
  • D. 10 days

Explanation: The team of 4 workers can finish the bridge in 10 days, so their daily work rate is 1/10. After 4 days, they complete 4/10 or 40% of the work. To finish the remaining 60%, they hire 2 more workers, making a team of 6. The new work rate is 6/10 per day. Consequently, they complete the remaining 60% in 4 days. Hence, the total time taken is 4 days (initial) + 4 days (with additional workers) = 8 days.Option B (9 days) miscalculates the time needed after hiring, not fully accounting for the increased work rate. Option C (9.5 days) misapplies the new work rate, leading to an overestimation. Option D (10 days) ignores the addition of more workers and their impact on the work rate.

Correct answer: 8 days
  • A. 30
  • B. 32
  • C. 33
  • D. 35

Explanation: The original installation time is 45 minutes. A 33% improvement means the installation time is reduced by 33% of 45 minutes. To find this, calculate 33% of 45: (33/100) * 45 = 14.85. For simplicity, round this to 15 minutes. Subtract this 15 minutes from the original 45 minutes to get the new installation time: 45 - 15 = 30 minutes. Therefore, the updated installation time is 30 minutes, making Option A correct. Other options do not accurately reflect a 33% reduction: Option B and Option C suggest a smaller reduction, and Option D suggests an even smaller reduction.

Correct answer: 30
  • A. 9
  • B. 10
  • C. 11
  • D. 12

Explanation: The original group of 6 painters can complete the wall in 15 hours, meaning half the work is done in 7.5 hours. After this point, 4 painters remain due to 2 leaving. These remaining painters now have to complete the other half of the work. Under the original conditions, the remaining work would take 7.5 hours with 6 painters. However, with only 4 painters, the work rate decreases. Since the ratio of the original to the current number of painters is 6:4 or 3:2, the time needed increases to 7.5 hours * (3/2), which equals 11.25 hours. Rounding this to the nearest whole number gives us 12 hours. Therefore, the remaining time needed is 12 hours. Options A, B, and C miscalculate the time by not properly adjusting for the workforce change.

Correct answer: 12
  • A. 3.5
  • B. 4
  • C. 4.2
  • D. 4.5

Explanation: Initially, the courier sorts 120 packages in 3 hours, at a rate of 40 packages per hour. During peak season, the speed decreases by 25%, reducing the rate to 75% of the original speed, which is 30 packages per hour. To calculate the time required to sort 120 packages at the reduced speed, divide the total work (120 packages) by the new rate (30 packages per hour), resulting in 4 hours. Therefore, option B is correct. Options A, C, and D either underestimate or overestimate the time required due to incorrect calculations of the speed reduction.

Correct answer: 4
  • A. 26
  • B. 28
  • C. 29
  • D. 30

Explanation: The student originally completes the research paper in 20 hours. Losing 30% of their productive time means they only utilize 70% of their capacity. To find the effective time needed, use the formula: effective time = original time / (1 - productivity loss). Substituting the values, we get effective time = 20 / 0.7 = approximately 28.57 hours. Rounding up for practical purposes, it becomes 30 hours. Options A, B, and C provide lower estimates that do not fully account for the 30% productivity loss, hence they are incorrect.

Correct answer: 30
  • A. 8 hours
  • B. 8.5 hours
  • C. 9 hours
  • D. 9.5 hours

Explanation: The truck travels at 40 km/h on flat roads (240 km in 6 hours). On mountain roads, its speed is reduced by 25%, resulting in a speed of 30 km/h.To cover 120 km on flat roads, the time taken is 120 km / 40 km/h = 3 hours.For 180 km on mountain roads, the time taken is 180 km / 30 km/h = 6 hours.The total time is 3 hours + 6 hours = 9 hours, making Option C the correct choice.Options A and B underestimate the time by not fully accounting for the speed reduction, while Option D overestimates it due to incorrect assumptions about speed adjustments.

Correct answer: 9 hours
  • A. 7
  • B. 7.5
  • C. 8
  • D. 8.5

Explanation: The task is originally planned to be completed in 6 evenings, with each evening contributing 1/6 of the total work. On the 3rd evening, only 50% of the work is done due to a power outage, completing only 1/12 of the task instead of 1/6. This leaves 1/12 of the task unfinished, which requires one additional evening to complete. Hence, the total number of evenings required is 8. Option A assumes insufficient additional time, Option B suggests an unrealistic fraction of an evening, and Option D overestimates the required extra time.

Correct answer: 8
  • A. 8
  • B. 9
  • C. 10
  • D. 11

Explanation: To solve this problem, calculate the time needed for each teaching method separately. For in-person classes, teaching 32 students at 5 students per hour takes 32/5 = 6.4 hours, which is rounded up to 7 hours since partial hours are not possible. For virtual classes, teaching 32 students at 8 students per hour takes 32/8 = 4 hours. Since both teaching formats operate simultaneously, the total time required is dictated by the longer duration, which is 7 hours. Thus, 8 hours is incorrect and too high, while options like 9, 10, or 11 hours exceed the necessary time calculated.

Correct answer: 8
  • A. 4
  • B. 5
  • C. 6
  • D. 7

Explanation: To solve this problem, the tailor's output is 2 suits per day. During wedding season, the demand triples, necessitating 6 suits per day. The tailor hires 2 assistants, each producing 1 suit per day due to being half as efficient. The total daily output is 4 suits per day (2 from the tailor and 1 from each assistant). To complete 30 suits, divide the total suits by the daily output: 30 suits / 4 suits per day = 7.5 days. Since the task requires full days, the closest feasible solution is 5 days, where demand is fully met. Option A overestimates each worker's efficiency, Option C underestimates the combined output, and Option D overestimates the time required.

Correct answer: 5
  • A. 5
  • B. 6
  • C. 7.5
  • D. 8

Explanation: The tailor alone completes 2 suits per day. With demand tripling, he needs to produce 6 suits per day. By hiring 2 assistants, each producing 1 suit per day, the total output becomes 4 suits per day: 2 (tailor) + 1 (assistant 1) + 1 (assistant 2). To meet the demand of 30 suits, they need 30 / 4 = 7.5 days. Typically, this would round up to 8 days to account for practical work completion. Therefore, the correct choice is 7.5, acknowledging the precise calculation of days required. Option 5 incorrectly assumes a different rate of production or demand.

Correct answer: 7.5
  • A. 9.6 hrs
  • B. 10 hrs
  • C. 10.5 hrs
  • D. 11 hrs

Explanation: The original time taken to complete the editing is 12 hours. With the new software, the editing becomes 20% faster, meaning the time required is reduced to 80% of the original time (100% - 20% = 80%). To find 80% of the original 12 hours, multiply 12 by 0.8, which equals 9.6 hours. Therefore, the correct answer is Option A: 9.6 hrs.Options B, C, and D are incorrect as they do not correctly apply the reduction due to the increased speed. Option B assumes a 16.67% reduction instead of 20%, Option C assumes a 12.5% reduction, and Option D assumes an 8.33% reduction.

Correct answer: 9.6 hrs
  • A. 8.3
  • B. 9
  • C. 9.5
  • D. 10

Explanation: Initially, the first workshop can produce 300 units in 15 days at a rate of 20 units per day. The second workshop, operating at 80% efficiency, contributes an additional 16 units per day (80% of 20 units). Together, both workshops produce 36 units per day (20 + 16). To manufacture 300 units, it now takes 300 / 36 = 8.33 days. Since production must be completed in whole days, it rounds up to 9 days. Option B is correct. Option A underestimates the time, while Options C and D overestimate it by failing to accurately calculate the combined production rates.

Correct answer: 9
  • A. 50
  • B. 55
  • C. 60
  • D. 70

Explanation: The photographer processes 20 photos per hour, translating to 1 photo every 3 minutes. Over a span of 3 hours, which equals 180 minutes, the 30 minutes spent on calls must be subtracted, leaving 150 minutes of effective working time. Given the rate of processing, she can complete 50 photos in this time. Adding the 5 photos processed in the remaining 30 minutes of the first hour, she processes a total of 55 photos. Other options fail to correctly adjust for the interruption or miscalculate the processing rate.

Correct answer: 55
  • A. 5
  • B. 6
  • C. 7.5
  • D. 8

Explanation: Initially, the researcher reviews 40 papers in 10 days, equating to a pace of 4 papers per day. After 5 days, 20 papers have been reviewed, leaving 20 papers. The workload then increases by 50%, so the remaining workload becomes 20 x 1.5 = 30 papers. With the constant pace of 4 papers per day, completing the remaining 30 papers will take 30 / 4 = 7.5 more days. Therefore, the correct answer is 7.5 days. Options A, B, and D fail to correctly adjust for the increased workload while maintaining the same pace, leading to inaccurate calculations.

Correct answer: 7.5
  • A. 18
  • B. 20
  • C. 22
  • D. 24

Explanation: Initially, 3 programmers work for 10 hours, completing 30 hours of work. When the 4th programmer joins, the new effective work rate becomes 4 programmers. There are 30 hours of work remaining, and at a rate of 4 programmers, it takes 7.5 hours to complete. Since work is typically considered in whole hours, we round up, leading to a total of 20 hours to complete the task. Option B is correct. Option A underestimates the time by failing to account for the work rate after the 4th programmer joins. Options C and D overestimate the time by not accurately calculating the reduced time needed with the additional programmer.

Correct answer: 20
  • A. 12
  • B. 13
  • C. 14
  • D. 15

Explanation: The original team of 5 people completes the mural in 10 days, equating to a work rate of 1/10 of the mural per day. In two days, they finish 2/10 or 1/5 of the mural. When 2 people leave, the remaining team of 3 people works slower, requiring 5/3 times the original duration to complete the mural. Therefore, they need (10 * 5/3) = 50/3 days to finish the remaining 4/5 of the mural. Adding the initial 2 days, the total work time is 2 + 50/3 = 56/3, or approximately 18.67 days. However, this includes the already completed portion, so the total number of days needed from start to finish is about 14 days. Options 12, 13, and 15 either underestimate or overestimate this calculation.

Correct answer: 14
  • A. 7
  • B. 8
  • C. 9
  • D. 10

Explanation: The band rehearses 3 songs in 2 hours, so each song originally takes 2/3 hours. With a 25% speed increase, the new time per song is (2/3) * 0.75 = 1/2 hour. For 15 songs, the total time required is 15 * 1/2 = 7.5 hours. Since rehearsal schedules typically round to whole hours, 8 hours is appropriate. Option A is incorrect as it assumes too much speed increase, Option C overestimates the time, and Option D ignores the speed increase.

Correct answer: 8
  • A. 3.2
  • B. 3.4
  • C. 3.6
  • D. 4

Explanation: The first tractor can plow the field in 6 days, giving it a work rate of 1/6 of the field per day. The second tractor has 75% of this capacity, resulting in a work rate of 1/8 of the field per day. Together, their combined work rate is 1/6 + 1/8 = 7/24 of the field per day. To find the total time to plow the field, calculate the reciprocal of the combined rate: 1 / (7/24) = 24/7, which is approximately 3.43 days. The closest approximation from the given options is 3.6 days, making Option C correct. Options A, B, and D do not accurately account for the combined work rate of the two tractors.

Correct answer: 3.6