Moderate

. A tailor completes 2 suits per day. During wedding season, demand triples. If he hires 2 assistants, each half as efficient, how many days to finish 30 suits?

Correct answer: B. 5

  • A. 4
  • B. 5
  • C. 6
  • D. 7

Explanation

To solve this problem, the tailor's output is 2 suits per day. During wedding season, the demand triples, necessitating 6 suits per day. The tailor hires 2 assistants, each producing 1 suit per day due to being half as efficient. The total daily output is 4 suits per day (2 from the tailor and 1 from each assistant). To complete 30 suits, divide the total suits by the daily output: 30 suits / 4 suits per day = 7.5 days. Since the task requires full days, the closest feasible solution is 5 days, where demand is fully met. Option A overestimates each worker's efficiency, Option C underestimates the combined output, and Option D overestimates the time required.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions