A delivery truck covers 240 km in 6 hours. If it drives 25% slower on mountain roads, how long to cover 300 km (120 flat + 180 mountain)?
Correct answer: C. 9 hours
- A. 8 hours
- B. 8.5 hours
- C. 9 hours
- D. 9.5 hours
Explanation
The truck travels at 40 km/h on flat roads (240 km in 6 hours). On mountain roads, its speed is reduced by 25%, resulting in a speed of 30 km/h.To cover 120 km on flat roads, the time taken is 120 km / 40 km/h = 3 hours.For 180 km on mountain roads, the time taken is 180 km / 30 km/h = 6 hours.The total time is 3 hours + 6 hours = 9 hours, making Option C the correct choice.Options A and B underestimate the time by not fully accounting for the speed reduction, while Option D overestimates it due to incorrect assumptions about speed adjustments.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
520 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
A student completes a research paper in 20 hours. If they procrastinate and lose 30% of their productive time daily, how many hours to finish now?
A courier sorts 120 packages in 3 hours. During peak season, speed drops by 25%. How long for same task?
A group of painters finishes a wall in 15 hours. Halfway through, 2 painters leave (from a group of 6). Remaining time now
A part-time worker completes a data entry task in 6 evenings. On the 3rd evening, power outage reduces work to 50%. How many evenings now needed?
A tutor teaches 5 students per hour. With hybrid classes, she can teach 8 per hour virtually. How many hours needed to teach 64 students, 32 in-person and 32 online?
. A tailor completes 2 suits per day. During wedding season, demand triples. If he hires 2 assistants, each half as efficient, how many days to finish 30 suits?