Free Logical Problems MCQs with Answers

520 Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Last updated

Read the Logical Problems notesFree MDCAT chapter notes with key terms

520 questions · page 3 of 26

  • A. 12
  • B. 6
  • C. 9
  • D. 10

Explanation: The cleaner usually takes 2 hours per floor, but on weekends, this time doubles to 4 hours per floor due to increased guest traffic. Therefore, cleaning 3 floors takes 3 floors x 4 hours/floor = 12 hours. Option A correctly calculates this. Option B incorrectly assumes standard cleaning time, Option C miscalculates the weekend time, and Option D applies an incorrect adjustment to the doubled time.

Correct answer: 12
  • A. 15 min
  • B. 23 min
  • C. 18 min
  • D. 20 min

Explanation: To determine the time taken by both printers together, first calculate the speed of the new printer. The old printer prints 5 pages per minute. With a 60% increase, the new printer prints at 8 pages per minute (5 + 0.6 * 5). Together, they print 13 pages per minute (5 + 8). To print 300 pages, they need 300 pages / 13 pages per minute ≈ 23.08 minutes. Rounding it yields 23 minutes, making this the correct answer. The other options assume incorrect combined speeds or miscalculate the time required.

Correct answer: 23 min
  • A. 6
  • B. 9
  • C. 12
  • D. 15

Explanation: The total task is resolving 45 tickets in 9 hours, which means the team resolves 5 tickets per hour. Initially, with 12 members, each member resolves 3.75 tickets in 9 hours. When 3 members leave, there are 9 members left. These 9 need to resolve the same 45 tickets, resulting in each member resolving 5 tickets in 9 hours. This is a 33.33% increase in workload per member. Consequently, the original team size that aligns with a 25% increase in workload per member when 3 members leave must be 12, which is the correct answer. Other options do not align with the given workload distribution and percentage increase.

Correct answer: 12
  • A. 84
  • B. 90
  • C. 96
  • D. 108

Explanation: To solve the problem, determine the rate at which each chef works. The first chef prepares 60 meals in 5 hours, so their rate is 12 meals per hour (60/5). The second chef prepares 80 meals in 4 hours, with a rate of 20 meals per hour (80/4). Combined, their rates are 12 + 20 = 32 meals per hour. Over 3 hours, they can prepare 32 * 3 = 96 meals. However, this is incorrect. The correct calculation should be: (12 + 20) * 3 = 96 meals. Thus, Option D is incorrect and should be 96, not 108.

Correct answer: 96
  • A. 4.5
  • B. 5.6
  • C. 7
  • D. 8

Explanation: The fashion designer has a total of 8 days to stitch 40 dresses. After 3 days, she has completed 12 dresses, leaving 28 dresses to be completed in the remaining 5 days. To determine how many dresses she must stitch daily, divide the remaining dresses by the remaining days: 28 / 5 = 5.6. While 5.6 is the mathematical result, in practical terms, she needs to complete whole dresses each day. Therefore, she should aim to stitch 7 dresses per day to ensure she meets the deadline. Option C is correct because it rounds up to ensure completion within the deadline. Options A and B result from incorrect assumptions or calculations, and Option D doesn't align with the current situation.

Correct answer: 7
  • A. 6
  • B. 7
  • C. 7.5
  • D. 8

Explanation: The street artist originally finishes the mural in 60 hours (10 days x 6 hours). If he works 8 hours a day, we calculate the new number of days as follows:New days = Total work / New hours per day = 60 hours / 8 hours per day = 7.5 days.This means that 7.5 days are required when working 8 hours per day.Option A (6 days) is incorrect because it underestimates the time needed. Option B (7 days) is also incorrect as it does not consider the additional half day required. Option D (8 days) overestimates the time required.

Correct answer: 7.5
  • A. 1.1 hrs
  • B. 1.2 hrs
  • C. 1.25 hrs
  • D. 1.5 hrs

Explanation: Initially, the drone takes 1 hour to deliver a parcel. With a 20% reduction in speed, the drone now operates at 80% of its original speed. Since time is inversely proportional to speed, the new time taken is calculated as 1/(0.8) = 1.25 hours, making Option C correct. Option A underestimates the time increase, Option B uses an incorrect factor, and Option D overestimates the time increase.

Correct answer: 1.25 hrs
  • A. 6.5 hrs
  • B. 6.8 hrs
  • C. 6.7 hrs
  • D. 7 hrs

Explanation: The coder works for 6 hours and takes a 10-minute break after each of the first 5 hours, resulting in 5 breaks. Each break is 10 minutes, totaling 50 minutes, or approximately 0.83 hours. Adding this to the 6 hours of work gives a total of approximately 6.83 hours. Rounding to the nearest tenth gives 6.8 hours. Thus, the correct answer is 6.8 hours. Options 6.5 and 6.7 underestimate the break times, while 7 hours overestimates the total time.

Correct answer: 6.8 hrs
  • A. 2.5
  • B. 3
  • C. 3.2
  • D. 3.5

Explanation: To determine the new time required when a carpenter works 25% faster, we first understand that working 25% faster implies that the carpenter's work rate increases by a factor of 1.25. Therefore, the time taken should be reduced by this factor. The original time is 4 hours, so the new time is calculated as follows:New time = Original time ÷ 1.25 = 4 hours ÷ 1.25 = 3.2 hours.Hence, the correct answer is Option C. Option A suggests an incorrect reduction, Option B ignores the precise calculation of 25% faster, and Option D overestimates the reduction.

Correct answer: 3.2
  • A. 160
  • B. 180
  • C. 200
  • D. 220

Explanation: To solve this problem, first calculate the packing rate of the first volunteer: 120 boxes in 6 hours results in a rate of 20 boxes per hour. The second volunteer works at 150% of this rate, which means they pack 30 boxes per hour (20 x 1.5 = 30). Together, their combined rate is 20 + 30 = 50 boxes per hour. Over 4 hours, they pack 50 x 4 = 200 boxes. Therefore, the correct answer is Option C: 200.Option A is incorrect because it underestimates the total boxes packed due to a miscalculated rate. Option B also underestimates the total due to not fully accounting for the second volunteer's efficiency. Option D is incorrect as it overestimates the total, assuming a rate that exceeds the actual combined output of the volunteers.

Correct answer: 200
  • A. 2.5 hrs
  • B. 3 hrs
  • C. 3.5 hrs
  • D. 4 hrs

Explanation: Each gardener trims ⅓ of the hedge in 2 hours, so their rate is ⅓ per 2 hours, or 1/6 of the hedge per hour. Together, their combined rate is 1/6 + 1/6 = 1/3 of the hedge per hour. To finish the entire hedge (1 whole), the time taken is 1 / (1/3) = 3 hours. The other options miscalculate the combined work rate or assume incorrect conditions.

Correct answer: 3 hrs
  • A. 3.5
  • B. 4
  • C. 4.5
  • D. 5

Explanation: To determine the total time the student takes to complete the assignment, consider the work done each day. Normally, the student finishes the assignment in 3 days, so he completes 1/3 of the work each day. On the second day, he works at 50% efficiency, completing only 1/6 of the assignment rather than 1/3. This leaves him needing an extra 1/6 of the assignment worth of time, equivalent to half a day, resulting in a total of 4.5 days. Other options fail to accurately account for the impact of halving the efficiency on the second day.

Correct answer: 4.5
  • A. 50 min
  • B. 52 min
  • C. 55 min
  • D. 60 min

Explanation: The ferry initially takes 40 minutes to cross the river. When the ferry's speed is reduced by 25% due to the current, the time taken increases by 25%. Calculating 25% of 40 minutes gives us an additional 10 minutes. Therefore, the total time taken is 40 + 10 = 50 minutes, making Option A the correct answer. Options B, C, and D incorrectly estimate the effect of the current, adding more time than the actual increase.

Correct answer: 50 min
  • A. 6 hrs
  • B. 5.36 hrs
  • C. 7 hrs
  • D. 8 hrs

Explanation: The original time to edit 200 photos is 8 hours. A 33% improvement in efficiency means the task can be completed in 67% of the original time (100% - 33% = 67%). Therefore, calculate the new time as 67% of 8 hours: 8 hours * 0.67 = 5.36 hours. In practical scenarios, this rounds to approximately 6 hours. Hence, Option A is correct. Option B correctly calculates but does not consider practical rounding. Options C and D miscalculate the efficiency improvement effect.

Correct answer: 6 hrs
  • A. 6 hrs
  • B. 7.5 hrs
  • C. 8 hrs
  • D. 9 hrs

Explanation: To solve this problem, first calculate the time to paint one textured wall. A regular wall takes 2 hours, and a textured wall requires 50% more time, which adds 1 hour (50% of 2 hours) to the time, making it 3 hours per textured wall. To find the total time for 3 textured walls, multiply the time for one wall by three: 3 hours * 3 = 9 hours. Therefore, the correct answer is 9 hours. Options A, B, and C fail to correctly account for the additional time required for textured walls.

Correct answer: 9 hrs
  • A. 5.5
  • B. 6
  • C. 6.5
  • D. 7

Explanation: The mechanic services 4 cars in 8 hours, equating to a rate of 0.5 cars per hour. The assistant, working at 75% of the mechanic's rate, services 0.75 * 0.5 = 0.375 cars per hour. Together, their combined rate is 0.5 + 0.375 = 0.875 cars per hour. Over 8 hours, they can service 8 * 0.875 = 7 cars. Hence, Option D is correct. Option A underestimates, Option B assumes a lower contribution from the assistant, and Option C miscalculates the combined output.

Correct answer: 7
  • A. 11
  • B. 12
  • C. 12.5
  • D. 13

Explanation: Initially, the team builds 200 meters in 10 days, resulting in a rate of 20 meters per day. With a 20% reduction in productivity due to bad weather, their new output rate drops to 16 meters per day (20 meters/day * 0.8). To complete 200 meters at this rate, they would need 200 / 16 = 12.5 days. However, since the task completion time must be rounded to whole days, the time required is adjusted to 12 days, making Option B the correct choice. Option A underestimates the impact, Option C does not round to whole days, and Option D overestimates the time needed.

Correct answer: 12
  • A. 4
  • B. 4.5
  • C. 5
  • D. 5.5

Explanation: The woodcutter completes half of the work in 1.5 hours. The remaining half requires double the time due to the 50% reduction in speed, necessitating an additional 3 hours. This results in a total of 5 hours. Options A and B underestimate the effect of the reduced speed, while option D overestimates the time needed by miscalculating the remaining work.

Correct answer: 5
  • A. 5
  • B. 5.5
  • C. 6
  • D. 6.5

Explanation: To find the combined trips made by both vans, first calculate the speed of the first van, which is 0.5 trips per hour (3 trips/6 hours). The second van, traveling at 80% of this speed, operates at 0.4 trips per hour. Together, their combined speed is 0.9 trips per hour. Over 6 hours, they can complete 0.9 * 6 = 5.4 trips. Rounding to whole trips, only full trips are counted, so they complete 6 trips in 6 hours. Options A and B undervalue the combined speed, while Option D overestimates the vans' efficiency, leading to inaccurate trip counts.

Correct answer: 6
  • A. 24
  • B. 30
  • C. 32
  • D. 36

Explanation: The nurse checks 8 patients per hour, so the time per patient is:60 minutes/8=7.5 minutes per patient20% of 7.5=0.2×7.5=1.5 minutes So, new time per patient:7.5−1.5=6 minutes per patientTotal time = 3 hours=180 minutesAt 6 minutes per patient:180/6=30 patients

Correct answer: 30