A carpenter makes a table in 4 hours. If he works 25% faster using electric tools, time needed per table is:

Correct answer: C. 3.2

  • A. 2.5
  • B. 3
  • C. 3.2
  • D. 3.5

Explanation

To determine the new time required when a carpenter works 25% faster, we first understand that working 25% faster implies that the carpenter's work rate increases by a factor of 1.25. Therefore, the time taken should be reduced by this factor. The original time is 4 hours, so the new time is calculated as follows:New time = Original time ÷ 1.25 = 4 hours ÷ 1.25 = 3.2 hours.Hence, the correct answer is Option C. Option A suggests an incorrect reduction, Option B ignores the precise calculation of 25% faster, and Option D overestimates the reduction.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Logical Problems questions