A street artist finishes a mural in 10 days working 6 hours a day. If he works 8 hours a day, how many days does he need?

Correct answer: C. 7.5

  • A. 6
  • B. 7
  • C. 7.5
  • D. 8

Explanation

The street artist originally finishes the mural in 60 hours (10 days x 6 hours). If he works 8 hours a day, we calculate the new number of days as follows:New days = Total work / New hours per day = 60 hours / 8 hours per day = 7.5 days.This means that 7.5 days are required when working 8 hours per day.Option A (6 days) is incorrect because it underestimates the time needed. Option B (7 days) is also incorrect as it does not consider the additional half day required. Option D (8 days) overestimates the time required.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions