A mechanic services 4 cars in 8 hours. If he gets help from an assistant who works at 75% his rate, how many cars in 8 hours together?
Correct answer: D. 7
- A. 5.5
- B. 6
- C. 6.5
- D. 7
Explanation
The mechanic services 4 cars in 8 hours, equating to a rate of 0.5 cars per hour. The assistant, working at 75% of the mechanic's rate, services 0.75 * 0.5 = 0.375 cars per hour. Together, their combined rate is 0.5 + 0.375 = 0.875 cars per hour. Over 8 hours, they can service 8 * 0.875 = 7 cars. Hence, Option D is correct. Option A underestimates, Option B assumes a lower contribution from the assistant, and Option C miscalculates the combined output.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
A painter covers a 10x10 wall in 2 hours. A textured wall requires 50% more time. Time to paint 3 textured walls?
A photography team edits 200 photos in 8 hours. A new software improves efficiency by 33%. New total editing time?
A ferry takes 40 minutes to cross a river. If current slows it down by 25%, time taken increases to:
A team builds 200 meters of road in 10 days. Bad weather reduces their output by 20%. New completion time?
A woodcutter can chop a tree in 3 hours. He works for 1.5 hours, then switches to a duller axe reducing speed by 50%. Total time now?
A delivery van makes 3 trips in 6 hours. A second van with 80% the speed is added. Together, trips in 6 hours?