All Free Analytical and Logical Reasoning MCQs with Answers

Every Analytical and Logical Reasoning question in the bank, across all chapters, each with the correct answer and a written explanation. Free and unlimited, with no account needed.

2,989 questions · page 17 of 150

  • A. 1
  • B. 2
  • C. 3
  • D. 4

Explanation: The bakery originally operates with 2 bakers producing 60 cakes daily, equating to each baker making 30 cakes.

Correct answer: 1
  • A. 8
  • B. 9
  • C. 10
  • D. 11

Explanation: The initial team can paint 1 house in 4 days, so their rate is 1/4 house per day. In the first 2 days, they complete 1/2 of a house.

Correct answer: 9
  • A. 34
  • B. 36
  • C. 37.5
  • D. 38

Explanation: The developer originally completes the app in 30 calendar days. With a 20% speed increase, his effective working rate improves to 1.2…

Correct answer: 37.5
  • A. 660
  • B. 700
  • C. 720
  • D. 750

Explanation: To solve this problem, first, determine the rate at which each machine fills bottles.

Correct answer: 700
  • A. 5.5
  • B. 6
  • C. 6.5
  • D. 7

Explanation: The content creator needs to upload a total of 15 videos over 3 weeks. They have already uploaded 4 videos in the first week, leaving 11…

Correct answer: 6
  • A. 75
  • B. 80
  • C. 85
  • D. 90

Explanation: The original team of 6 members can complete the study in 90 days, which totals to 540 member-days of work (6 members × 90 days).

Correct answer: 80
  • A. 4 hrs
  • B. 3 hrs
  • C. 5 hrs
  • D. 5.5 hrs

Explanation: The window cleaner originally cleans 4 windows per hour. With the new equipment, the speed increases by 50%, leading to a rate of 4 + (0.5…

Correct answer: 5 hrs
  • A. 28
  • B. 30
  • C. 32
  • D. 34

Explanation: The first team works alone for 10 days, completing 10/40 = 1/4 of the book, leaving 3/4 of the book.

Correct answer: 30
  • A. 20
  • B. 21
  • C. 22
  • D. 23

Explanation: The pastry chef's rate is 12 cakes in 8 hours, which is 1.5 cakes per hour.

Correct answer: 21
  • A. 9
  • B. 10
  • C. 11
  • D. 12

Explanation: To determine the number of days required, start by calculating the total hours needed to complete 40 brochures: 40 brochures × 2.5 hours…

Correct answer: 10
  • A. 8 days
  • B. 9 days
  • C. 9.5 days
  • D. 10 days

Explanation: The team of 4 workers can finish the bridge in 10 days, so their daily work rate is 1/10.

Correct answer: 8 days
  • A. 30
  • B. 32
  • C. 33
  • D. 35

Explanation: The original installation time is 45 minutes. A 33% improvement means the installation time is reduced by 33% of 45 minutes.

Correct answer: 30
  • A. 9
  • B. 10
  • C. 11
  • D. 12

Explanation: The original group of 6 painters can complete the wall in 15 hours, meaning half the work is done in 7.5 hours.

Correct answer: 12
  • A. 3.5
  • B. 4
  • C. 4.2
  • D. 4.5

Explanation: Initially, the courier sorts 120 packages in 3 hours, at a rate of 40 packages per hour.

Correct answer: 4
  • A. 26
  • B. 28
  • C. 29
  • D. 30

Explanation: The student originally completes the research paper in 20 hours. Losing 30% of their productive time means they only utilize 70% of their…

Correct answer: 30
  • A. 8 hours
  • B. 8.5 hours
  • C. 9 hours
  • D. 9.5 hours

Explanation: The truck travels at 40 km/h on flat roads (240 km in 6 hours). On mountain roads, its speed is reduced by 25%, resulting in a speed of 30…

Correct answer: 9 hours
  • A. 7
  • B. 7.5
  • C. 8
  • D. 8.5

Explanation: The task is originally planned to be completed in 6 evenings, with each evening contributing 1/6 of the total work.

Correct answer: 8
  • A. 8
  • B. 9
  • C. 10
  • D. 11

Explanation: To solve this problem, calculate the time needed for each teaching method separately.

Correct answer: 8
  • A. 4
  • B. 5
  • C. 6
  • D. 7

Explanation: To solve this problem, the tailor's output is 2 suits per day. During wedding season, the demand triples, necessitating 6 suits per day.

Correct answer: 5
  • A. 5
  • B. 6
  • C. 7.5
  • D. 8

Explanation: The tailor alone completes 2 suits per day. With demand tripling, he needs to produce 6 suits per day.

Correct answer: 7.5