A alone can finish a work in X days. B alone can finish the same work in X+5 days. Together, they take 6 days to complete the work. Find X
Correct answer: C. 10
- A. 12
- B. 8
- C. 10
- D. 9
Explanation
The combined rate equation is 1/X + 1/(X+5) = 1/6. Multiplying through gives 6(2X+5) = X(X+5), so X² - 7X - 30 = 0 = (X-10)(X+3), and the positive value is X = 10 days. The likely mistake is 8 days, which does not satisfy the combined-rate equation.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Time and Work
Problems measure work through rates, treating each person's or machine's contribution as work completed per unit time. Questions cover combined work, efficiency, wages, alternate working schedules, pipes and cisterns, and men-days relationships, with care needed to distinguish time taken by one worker from the time required when workers act together.
Practise Arithmetic
1,060 free Arithmetic MCQs from Mathematics, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Mathematics questions like this
Mathematics is on 76 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Time and Work questions
A can do (1/3) of a work in 5 days and B can do (2/5) of the work in 10 days. In how many days both A and B together can do the work ?
A completes 80% of a work in 20 days. Then B also joins and A and B together finish the remaining work in 3 days. How long does it need for B if he alone completes the work?
Kamal will complete work in 20 days. If Suresh is 25% more efficient than Kamal, he can complete the work in________days.
P and Q need 8 days to complete a work. Q and R need 12 days to complete the same work. But P, Q and R together can finish it in 6 days. How many days will be needed if P and R together do it?
P can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in__________?
A leak in the bottom of a tank can empty the full tank in 6 hrs. An inlet pipe fills water at the rate of 4 lit. a minute. When the tank is full, the inlet is opened and due to the leak, the tank is empty in 8 hrs. The capacity of the tank in liters is_________?