Free CPEC and Development Projects MCQs with Answers
283 CPEC and Development Projects MCQs from Pakistan Current Affairs, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.
The China-Pakistan Economic Corridor covers its routes, Gwadar Port, energy projects, transport links, industrial zones, digital connectivity and cooperation under its long-term development framework. The topic also includes major dams, highways, airports, power plants and other national projects, distinguishing CPEC initiatives from Pakistan’s broader public development programme.
Last updated
283 questions · page 7 of 15
- A. 28 September 2020
- B. 22 September 2020
- C. 20 September 2020
- D. None of these
Explanation: Prime Minister Imran Khan inaugurated the 42-kilometre Sheikh Muhammad bin Zayed Al Nahyan Road on 28 September 2020. The project connects nine cities and six villages in Mohmand District.
Correct answer: 28 September 2020- A. 13 September 2020
- B. 15 September 2020
- C. 14 September 2020
- D. 16 September 2020
Explanation: Imran Khan laid the foundation stone of the Ravi Riverfront Urban Development Project on 15 September 2020. The project was planned as a major urban-development scheme along the Ravi River near Lahore.
Correct answer: 15 September 2020- A. US
- B. Turkey
- C. Russia
- D. China
Explanation: China provided Pakistan with 12 T16 drones to support locust-control operations. These drones were intended for surveillance and spraying assistance, not military combat.
Correct answer: China- A. Rawalpindi
- B. Quetta
- C. Karachi
- D. Peshawar
Explanation: The Pakistan-China optical-fibre link runs from Rawalpindi to Khunjerab over roughly 820 kilometres. It forms part of the communications infrastructure associated with CPEC.
Correct answer: Rawalpindi- A. Pakistan Ordance Factory Wah Cantt
- B. Heavy Industries Taxila (HIT)
- C. China
- D. Ukraine
Explanation: The handing-over ceremony for Al-Khalid-I tanks was held at Heavy Industries Taxila, Pakistan’s major armoured-vehicle manufacturing and overhaul complex. Pakistan Ordnance Factory Wah is primarily associated with arms and ammunition production.
Correct answer: Heavy Industries Taxila (HIT)- A. China and France
- B. China and Turkey
- C. China and Ukraine
- D. Turkey and Ukraine
Explanation: Al-Khalid-I was developed through Pakistan’s cooperation with China and Ukraine, combining Chinese tank-development expertise with Ukrainian technical assistance. Turkey and France were not the two partners named for this tank.
Correct answer: China and Ukraine- A. Al Khalid and Al Khalid-I
- B. Type 59 and Type 59-I
- C. Al Zarar and Al Zarar-I
- D. None of these
Explanation: Al-Khalid-I is an upgraded version of the Al-Khalid main battle tank. Type 59 and Al-Zarrar are separate tank designations, so those pairings do not fit the question.
Correct answer: Al Khalid and Al Khalid-I- A. Blue Rapid Transport
- B. Bus Rapid Transit
- C. Best Road Transportation
- D. Best Road Transit
Explanation: BRT means Bus Rapid Transit, a public-transport system using dedicated or priority bus corridors to provide faster urban travel. The other expansions are not standard transport terminology.
Correct answer: Bus Rapid Transit- A. 11th August, 2020
- B. 12th August, 2020
- C. 13th August, 2020
- D. 14th August, 2020
Explanation: The Peshawar Bus Rapid Transit system was formally inaugurated by Prime Minister Imran Khan on 13 August 2020, just before Independence Day. The project is commonly known as the Zu Peshawar BRT.
Correct answer: 13th August, 2020- A. Rs4 Trillion
- B. Rs10 Trillion
- C. Rs8 Trillion
- D. Rs5 Trillion
Explanation: The Ravi Urban Development Project, including the planned Ravi City, was announced with an estimated cost of about Rs5 trillion. It was presented as a major urban and riverfront development scheme for Lahore.
Correct answer: Rs5 Trillion- A. 800
- B. 300
- C. 100
- D. 700
Explanation: The Azad Pattan Hydropower Project was agreed with China as a 700-megawatt project under the China-Pakistan economic cooperation framework. The lower figures in the options refer to neither the project's planned capacity nor its commonly reported specification.
Correct answer: 700- A. Sindh
- B. Balochistan
- C. KPK
- D. Punjab
Explanation: The Mamikhel South-01 exploratory well was located in the Tal Block of Khyber Pakhtunkhwa. Tal Block is a major hydrocarbon-producing area in the province, not in Sindh, Balochistan or Punjab.
Correct answer: KPK- A. 5 years
- B. 8 years
- C. 10 years
- D. 12 years
Explanation: The reported claim was that Pakistan had achieved the relevant environmental and climate-related Sustainable Development Goal 10 years ahead of the 2030 deadline. Ten years before 2030 is 2020, matching option c.
Correct answer: 10 years- A. 2030
- B. 2028
- C. 2025
- D. 2035
Explanation: Pakistan's stated target was to generate 30 percent of its energy from clean or renewable sources by 2030. The year 2030 is also the broader deadline used for many national Sustainable Development Goals.
Correct answer: 2030- A. President Dr. Arif Alvi
- B. Prime minister Imran Khan
- C. Gen. Qamar Javed Bajwa
- D. None of above
Explanation: Prime Minister Imran Khan inaugurated the facility at NRTC, Haripur, for Pakistan's first indigenously produced ventilators. General Qamar Javed Bajwa was associated with the defence establishment, but was not the inaugurating official reported here.
Correct answer: Prime minister Imran Khan- A. United States
- B. None of These
- C. Saudi Arabia
- D. China
Explanation: China agreed to help Pakistan establish a phytosanitary facility, which supports the inspection and certification of agricultural exports. Such facilities are important for meeting international plant-health standards.
Correct answer: China- A. $700million
- B. $500million
- C. $900million
- D. $300million
Explanation: Pakistan expected to raise about $700 million by regulating satellite services, with the funds intended to support the national space programme. The figure refers to projected revenue rather than an already received grant.
Correct answer: $700million- A. Salahar Tombs
- B. Chaukhandi Tombs
- C. Charnemag Tombs
- D. Khanja Tombs
Explanation: The Chaukhandi Tombs are a centuries-old necropolis near Karachi, known for their distinctive carved sandstone graves. The other listed names do not identify the archaeological site referred to in the question.
Correct answer: Chaukhandi Tombs- A. 17th March 2020
- B. 19th March 2020
- C. 18th March 2020
- D. 20th March 2020
Explanation: The Sialkot-Lahore Motorway was formally opened for public traffic on 18 March 2020. This is a transport-infrastructure milestone, so the date is the key identifying detail.
Correct answer: 18th March 2020- A. Electronic Warfare (EW) and Ground Surveillance Radar (GSR) testing laboratories
- B. Line Communication Equipment
- C. LMR Digital Encrypted Base Station Radios
- D. None of these
Explanation: At NRTC Haripur, General Qamar Javed Bajwa inaugurated electronic warfare and ground-surveillance radar testing laboratories. These facilities support indigenous defence-electronics research and testing rather than ordinary communication equipment.
Correct answer: Electronic Warfare (EW) and Ground Surveillance Radar (GSR) testing laboratories