141. When Pakistan launched first Electronic Vehicle (EV) ?
- A. 21, Jan 2020
- B. 22, Jan 2020
- C. 23, Jan 2020
- D. 24, Jan 2020
Explanation: Pakistan’s first electric vehicle launch cited in this contemporary report took place on 24 January 2020. The date is distinct from later electric-vehicle policy announcements and subsequent locally developed EV models.
Correct answer: 24, Jan 2020142. Pakistan and China have decided to develop which city as a major industrial hub?
- A. Faisalabad
- B. Gawadar
- C. Lahore
- D. Karachi
Explanation: Faisalabad was identified for development as a major industrial hub through Pakistan-China cooperation, particularly because of its established textile and manufacturing base. Gwadar is mainly associated with the port and special economic zone.
Correct answer: Faisalabad143. Russia has provided Pakistan sanctions free structure for strategic North-South Gas Pipeline with estimated cost of__________ ?
- A. $1 billion
- B. $2 billion
- C. $4 billion
- D. $9 billion
Explanation: The sanctions-free framework for the Pakistan-Russia North-South Gas Pipeline placed its estimated cost at about $2 billion. The $4 billion and $9 billion figures are substantially above the commonly reported estimate.
Correct answer: $2 billion144. Prime Minister Imran Khan inaugurated __________ Dry Port in Nowshera on 10 January 2020?
- A. Jamrud Dry Port
- B. Havelian Dry Port
- C. Azakhel dry port
- D. Jehangira Dry Port
Explanation: Prime Minister Imran Khan inaugurated the Azakhel Dry Port in Nowshera on 10 January 2020. Jamrud and Havelian are separate transport locations and were not the facility inaugurated on that date.
Correct answer: Azakhel dry port145. Pakistan Aeronautical Complex, Kamra has achieved yet another remarkable milestone by rolling out the first batch of _________ JF-17 aircraft?
- A. 2 dual-seat
- B. 4 dual-seat
- C. 8 dual-seat
- D. None of these
Explanation: Pakistan Aeronautical Complex, Kamra rolled out the first batch of eight dual-seat JF-17 aircraft. The question refers to the number in that initial batch, not the number of single-seat aircraft produced.
Correct answer: 8 dual-seat146. World Bank will provide Pakistan a loan of_________ for construction of Khyber Pass Economic Corridor?
- A. $317 millions
- B. $397 millions
- C. $406 millions
- D. $459 millions
Explanation: The World Bank approved a loan of $406 million for the Khyber Pass Economic Corridor, a major road and regional-connectivity project. The other amounts do not match the approved financing figure.
Correct answer: $406 millions147. Prime Minister Imran Khan has inaugurated the country's first National Science and Technology Park at__________on 9 Dec, 2019?
- A. COMSAT
- B. Quad-e-Azam University
- C. NUST
- D. NUML University
Explanation: The National Science and Technology Park was inaugurated at NUST in Islamabad on 9 December 2019. NUST was chosen as the country’s first science and technology park location.
Correct answer: NUST148. The Chapari Darkhel Dam, a 10.5 MW Hydropower Project is being constructed in which district of KPK ?
- A. Kuram
- B. Mardan
- C. Gilgit
- D. Hunza
Explanation: The 10.5 MW Chapari Darkhel hydropower project is located in Kurram district of Khyber Pakhtunkhwa. Mardan, Gilgit and Hunza are not the district named for this project.
Correct answer: Kuram149. Saidu Sharif Airport is being constructed in__________?
- A. Gilgit
- B. AJ&K
- C. Swat
- D. Gwadar
Explanation: Saidu Sharif Airport is in Swat, Khyber Pakhtunkhwa. It serves the Swat Valley, so Gilgit, Azad Jammu and Kashmir and Gwadar are not correct locations.
Correct answer: Swat150. KP Govt Announces ___________KM Peshawar-DI Khan Motorway on 3rd December 2019?
- A. 250-KM
- B. 291-KM
- C. 339-KM
- D. 421-KM
Explanation: The proposed Peshawar–Dera Ismail Khan motorway was announced as approximately 339 kilometres long. The figure refers to the planned route, not an already completed motorway.
Correct answer: 339-KM