Free CPEC and Development Projects MCQs with Answers

283 CPEC and Development Projects MCQs from Pakistan Current Affairs, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

The China-Pakistan Economic Corridor covers its routes, Gwadar Port, energy projects, transport links, industrial zones, digital connectivity and cooperation under its long-term development framework. The topic also includes major dams, highways, airports, power plants and other national projects, distinguishing CPEC initiatives from Pakistan’s broader public development programme.

Last updated

283 questions · page 8 of 15

Very hard
  • A. 21, Jan 2020
  • B. 24, Jan 2020
  • C. 23, Jan 2020
  • D. 22, Jan 2020

Explanation: Pakistan’s first electric vehicle launch cited in this contemporary report took place on 24 January 2020. The date is distinct from later electric-vehicle policy announcements and subsequent locally developed EV models.

Correct answer: 24, Jan 2020
Moderate
  • A. Lahore
  • B. Gawadar
  • C. Faisalabad
  • D. Karachi

Explanation: Faisalabad was identified for development as a major industrial hub through Pakistan-China cooperation, particularly because of its established textile and manufacturing base. Gwadar is mainly associated with the port and special economic zone.

Correct answer: Faisalabad
Hard
  • A. $2 billion
  • B. $1 billion
  • C. $4 billion
  • D. $9 billion

Explanation: The sanctions-free framework for the Pakistan-Russia North-South Gas Pipeline placed its estimated cost at about $2 billion. The $4 billion and $9 billion figures are substantially above the commonly reported estimate.

Correct answer: $2 billion
Moderate
  • A. Jamrud Dry Port
  • B. Azakhel dry port
  • C. Havelian Dry Port
  • D. Jehangira Dry Port

Explanation: Prime Minister Imran Khan inaugurated the Azakhel Dry Port in Nowshera on 10 January 2020. Jamrud and Havelian are separate transport locations and were not the facility inaugurated on that date.

Correct answer: Azakhel dry port
Hard
  • A. 2 dual-seat
  • B. 8 dual-seat
  • C. 4 dual-seat
  • D. None of these

Explanation: Pakistan Aeronautical Complex, Kamra rolled out the first batch of eight dual-seat JF-17 aircraft. The question refers to the number in that initial batch, not the number of single-seat aircraft produced.

Correct answer: 8 dual-seat
Very hard
  • A. $317 millions
  • B. $397 millions
  • C. $406 millions
  • D. $459 millions

Explanation: The World Bank approved a loan of $406 million for the Khyber Pass Economic Corridor, a major road and regional-connectivity project. The other amounts do not match the approved financing figure.

Correct answer: $406 millions
Moderate
  • A. NUST
  • B. Quad-e-Azam University
  • C. COMSAT
  • D. NUML University

Explanation: The National Science and Technology Park was inaugurated at NUST in Islamabad on 9 December 2019. NUST was chosen as the country’s first science and technology park location.

Correct answer: NUST
Hard
  • A. Mardan
  • B. Kuram
  • C. Gilgit
  • D. Hunza

Explanation: The 10.5 MW Chapari Darkhel hydropower project is located in Kurram district of Khyber Pakhtunkhwa. Mardan, Gilgit and Hunza are not the district named for this project.

Correct answer: Kuram
Easy
  • A. Gilgit
  • B. AJ&K
  • C. Swat
  • D. Gwadar

Explanation: Saidu Sharif Airport is in Swat, Khyber Pakhtunkhwa. It serves the Swat Valley, so Gilgit, Azad Jammu and Kashmir and Gwadar are not correct locations.

Correct answer: Swat
Moderate
  • A. 250-KM
  • B. 291-KM
  • C. 421-KM
  • D. 339-KM

Explanation: The proposed Peshawar–Dera Ismail Khan motorway was announced as approximately 339 kilometres long. The figure refers to the planned route, not an already completed motorway.

Correct answer: 339-KM
Easy
  • A. Swabi
  • B. Kohistan
  • C. Lakki Marwat
  • D. Malakand

Explanation: The Dasu Hydropower Project is located in Kohistan District, now administratively associated with Upper Kohistan, in Khyber Pakhtunkhwa. It is one of Pakistan’s major hydropower projects on the Indus.

Correct answer: Kohistan
Easy
  • A. Khurram
  • B. Jhelum
  • C. Indus
  • D. Kabul

Explanation: Dasu Hydropower Project is being built on the Indus River in Kohistan. Jhelum and Kabul are also major rivers, but neither is the site river for Dasu.

Correct answer: Indus
Hard
  • A. 4045 MW
  • B. 4140 MW
  • C. 4220 MW
  • D. 4320 MW

Explanation: The planned generation capacity of the Dasu Hydropower Project is 4,320 megawatts, developed in two stages. The figures around 4,000 MW refer to its overall project capacity rather than a smaller single unit.

Correct answer: 4320 MW
Hard
  • A. Rs 52.5 Billion
  • B. Rs 50.5 Billion
  • C. Rs 50.5 Million
  • D. Rs 52.5 Million

Explanation: WAPDA signed a contract valued at Rs52.5 billion for works related to the Dasu Hydropower Project on 25 November 2019. The million-rupee options are far too small for a major hydropower contract.

Correct answer: Rs 52.5 Billion
Hard
  • A. 23 Nov,2019
  • B. 25 Nov,2019
  • C. 24 Nov,2019
  • D. 20 Nov,2019

Explanation: Prime Minister Imran Khan launched the Clean Green Pakistan Index on 25 November 2019. The index was designed to compare cities on cleanliness and environmental performance.

Correct answer: 25 Nov,2019
Very hard
  • A. 15
  • B. 16
  • C. 24
  • D. 19

Explanation: The Clean Green Pakistan Index was initially launched for 19 cities. It was intended as a performance-based measure of cleanliness, sanitation and environmental conditions.

Correct answer: 19
Fairly easy
  • A. Balochistan ✓
  • B. Gilgit-Baltistan
  • C. KPK
  • D. Sindh

Explanation: Sabakzai Dam is a WAPDA project in Balochistan, developed under the Vision 2025 programme. It is located in the Zhob area and supports irrigation and water storage.

Correct answer: Balochistan ✓
Moderate
  • A. 382Km
  • B. 392 Km ✓
  • C. 402 Km
  • D. None of these

Explanation: The Sukkur-Multan M-5 section is approximately 392 km long and forms a major southern part of the Peshawar-Karachi motorway route. It was inaugurated on November 5, 2019.

Correct answer: 392 Km ✓
Moderate
  • A. Beijing
  • B. Shanghai
  • C. Kashgar ✓
  • D. Xinjiang

Explanation: The overland CPEC route is generally described as beginning at Kashgar in China’s Xinjiang region and extending to Gwadar in Pakistan. Xinjiang is the province or autonomous region, whereas Kashgar is the specific city named in the option.

Correct answer: Kashgar ✓
Fairly easy
  • A. Nankana sahab ✓
  • B. Gujranwala
  • C. Hafizabad
  • D. Narowal

Explanation: Baba Guru Nanak University was planned for Nankana Sahib, the birthplace of Guru Nanak. The district’s religious and historical significance makes it the natural location for the university.

Correct answer: Nankana sahab ✓