  • A. 50 min
  • B. 52 min
  • C. 55 min
  • D. 60 min

Explanation: The ferry initially takes 40 minutes to cross the river. When the ferry's speed is reduced by 25% due to the current, the time taken…

Correct answer: 50 min
  • A. 6 hrs
  • B. 5.36 hrs
  • C. 7 hrs
  • D. 8 hrs

Explanation: The original time to edit 200 photos is 8 hours. A 33% improvement in efficiency means the task can be completed in 67% of the original…

Correct answer: 6 hrs
  • A. 6 hrs
  • B. 7.5 hrs
  • C. 8 hrs
  • D. 9 hrs

Explanation: To solve this problem, first calculate the time to paint one textured wall.

Correct answer: 9 hrs
  • A. 5.5
  • B. 6
  • C. 6.5
  • D. 7

Explanation: The mechanic services 4 cars in 8 hours, equating to a rate of 0.5 cars per hour.

Correct answer: 7
  • A. 11
  • B. 12
  • C. 12.5
  • D. 13

Explanation: Initially, the team builds 200 meters in 10 days, resulting in a rate of 20 meters per day.

Correct answer: 12
  • A. 4
  • B. 4.5
  • C. 5
  • D. 5.5

Explanation: The woodcutter completes half of the work in 1.5 hours. The remaining half requires double the time due to the 50% reduction in speed…

Correct answer: 5
  • A. 5
  • B. 5.5
  • C. 6
  • D. 6.5

Explanation: To find the combined trips made by both vans, first calculate the speed of the first van, which is 0.5 trips per hour (3 trips/6 hours).

Correct answer: 6
  • A. 24
  • B. 30
  • C. 32
  • D. 36

Explanation: The nurse checks 8 patients per hour, so the time per patient is:60 minutes/8=7.5 minutes per patient20% of 7.5=0.2×7.5=1.5 minutes So…

Correct answer: 30
  • A. 34
  • B. 36
  • C. 38
  • D. 40

Explanation: The original time to edit the documentary is 60 hours. The AI software reduces this time by 40%.

Correct answer: 36
  • A. 145
  • B. 148
  • C. 150
  • D. 155

Explanation: Initially, the teacher grades 100 papers in 5 hours, giving a speed of 20 papers per hour.

Correct answer: 148
  • A. 4.8 hrs
  • B. 7.2 hrs
  • C. 8 hrs
  • D. 9 hrs

Explanation: To solve this problem, we first calculate the work rate of the original crane, which is 25 containers per hour (300 containers/12 hours).

Correct answer: 4.8 hrs
  • A. 6
  • B. 8
  • C. 10
  • D. 12

Explanation: To solve this problem, we first determine the total work in 'worker-minutes'.

Correct answer: 10
  • A. 6
  • B. 8
  • C. 10
  • D. 12

Explanation: The team originally completes the work in 15 days. With a 40% drop in efficiency, they function at 60% of their original efficiency.

Correct answer: 10
  • A. 10
  • B. 10.5
  • C. 13
  • D. 11.5

Explanation: The person writes 10 pages per hour for the first 3 hours, completing 30 pages.

Correct answer: 13
  • A. 6 min
  • B. 7 min
  • C. 8 min
  • D. 9 min

Explanation: Initially, the trainer guides 6 clients per hour, meaning each session lasts 10 minutes (60 minutes divided by 6 clients).

Correct answer: 7 min
  • A. 6 hrs
  • B. 6.5 hrs
  • C. 7 hrs
  • D. 7.5 hrs

Explanation: The original task takes 5 hours. The drone's efficiency is reduced by 25% due to wind, meaning it operates at 75% capacity.

Correct answer: 6 hrs
  • A. 3.5
  • B. 4
  • C. 4.5
  • D. 6

Explanation: The language translator's hourly work rate is 250 words per hour (1000 words / 4 hours).

Correct answer: 6
  • A. 1.2 hrs
  • B. 1.5 hrs
  • C. 1.8 hrs
  • D. 2 hrs

Explanation: To solve this problem, start by determining the work rate of each party.

Correct answer: 1.8 hrs
  • A. 12.5
  • B. 12
  • C. 14
  • D. 15

Explanation: The tailor sews at a rate of 0.5 shirts per hour (4 shirts/8 hours). The apprentice sews at 60% of this rate, which is 0.3 shirts per hour…

Correct answer: 12
  • A. 3.6 hrs
  • B. 4 hrs
  • C. 4.2 hrs
  • D. 5 hrs

Explanation: To solve this problem, first calculate the surveyor's speed in each terrain type.

Correct answer: 4 hrs