A fitness trainer guides 6 clients per hour. When clients increase to 12 per hour, each session becomes 30% shorter. What is the new time per client?
Correct answer: B. 7 min
- A. 6 min
- B. 7 min
- C. 8 min
- D. 9 min
Explanation
Initially, the trainer guides 6 clients per hour, meaning each session lasts 10 minutes (60 minutes divided by 6 clients). When the number of clients increases to 12 per hour, each session becomes 30% shorter. A 30% reduction of 10 minutes is 3 minutes (10 * 0.30 = 3). Therefore, the new session time is 7 minutes (10 minutes - 3 minutes = 7 minutes). Thus, Option B is correct. Option A is incorrect as it represents a 40% reduction. Option C incorrectly states the session time as 8 minutes. Option D represents a scenario with less than a 10% reduction, which is not applicable here.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?