The Installed Capacity of Neelum-Jhelum Hydropower Plant is __________ MW?
- A. 948
- B. 955
- C. 962
- D. 969
Explanation
The Neelum-Jhelum Hydropower Project has an installed generation capacity of 969 MW. It diverts Neelum River water through tunnels to a power station near Muzaffarabad.