The Installed Capacity of Neelum-Jhelum Hydropower Plant is __________ MW?

  • A. 948
  • B. 955
  • C. 962
  • D. 969

Explanation

The Neelum-Jhelum Hydropower Project has an installed generation capacity of 969 MW. It diverts Neelum River water through tunnels to a power station near Muzaffarabad.

Related questions