International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.

  • A. 5
  • B. 7
  • C. 9
  • D. 11

Explanation

In the Kishanganga arbitration, the Court allowed India’s diversion project but required a minimum flow of 9 cubic metres per second into the Neelum River. This condition was intended to preserve downstream environmental needs.