Moderate

If 4 men can do a job in 12 days, how long will 1 man take?

Correct answer: C. 48 days

  • A. 24 days
  • B. 36 days
  • C. 48 days
  • D. 60 days

Explanation

To find out how long 1 man would take to do the job alone, you first calculate the total work in man-days, which is the product of the number of men and the number of days they work together. Here, 4 men working for 12 days means the total work is 48 man-days (4 × 12 = 48). Therefore, 1 man would need 48 days to complete the same work alone. This makes Option C (48 days) the correct answer. Option A (24 days) and Option B (36 days) are both incorrect because they underestimate the amount of work, resulting in fewer total man-days. Option D (60 days) is incorrect because it exceeds the required 48 man-days.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions