A completes a task in 8 days. How many days for A to do half the work?
Correct answer: C. 4
- A. 2
- B. 3
- C. 4
- D. 6
Explanation
The correct answer is 4. Since A completes the entire task in 8 days, A completes 1/8 of the task per day. Therefore, to complete half of the task, A would need 4 days (since 1/8 * 4 = 1/2). Option 2 is incorrect because it only accounts for 1/4 of the work. Option 3 results in 3/8 of the work being done, which is less than half. Option 6 exceeds the halfway mark, completing 3/4 of the task.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
A does a job in 6 days. B does the same job in 3 days. Who is more efficient?
If a man completes a task in 10 days, how much work does he do in 1 day?
A courier company has to deliver 400 packages. If each van delivers 20/hour and 5 vans work together, how long to complete?
If A does 1/5 of a work in 1 day, he'll complete it in:
If 4 men can do a job in 12 days, how long will 1 man take?
A machine completes a job in 2 hours. Its rate of work is: