A machine completes a job in 2 hours. Its rate of work is:

Correct answer: A. 1/2

  • A. 1/2
  • B. 2
  • C. 1
  • D. 1/4

Explanation

The correct answer is 1/2. The machine completes one full job in 2 hours. Thus, in one hour, it completes half of the job, which is represented by the fraction 1/2. Option B is incorrect because a rate of 2 jobs per hour would imply the machine finishes a job in 30 minutes, not 2 hours. Option C is incorrect because completing 1 job per hour means finishing in 1 hour, contradicting the problem statement. Option D is incorrect because completing 1/4 of the job per hour would require 4 hours, not 2, to complete the entire job.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions