Moderate

A does a job in 6 days. B does the same job in 3 days. Who is more efficient?

Correct answer: B. B

  • A. A
  • B. B
  • C. Same
  • D. Depends on work

Explanation

The correct answer is B. Efficiency is determined by how quickly a task can be completed. Since B completes the job in 3 days while A takes 6 days, B is more efficient. Option A is incorrect because A takes longer to do the same work. Option C is incorrect because the time taken by A and B is different, indicating different efficiency levels. Option D is incorrect because the job is identical for both A and B, allowing for a direct comparison of efficiency based solely on time.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions