A digital team runs 3 ads in 4 days. If their goal increases to 12 ads in 8 days, by what percent should their speed increase?
Correct answer: A. 100%
- A. 100%
- B. 150%
- C. 200%
- D. 300%
Explanation
To calculate the percent increase in speed, first find the current speed of the team: they create 3 ads in 4 days, so their speed is 3/4 ads per day, or 0.75 ads per day. To meet the goal of 12 ads in 8 days, their required speed is 12/8 ads per day, or 1.5 ads per day. The speed needs to increase from 0.75 ads per day to 1.5 ads per day. The increase in speed is 1.5 - 0.75 = 0.75 ads per day. The percent increase is (0.75 / 0.75) * 100% = 100%. Therefore, the correct answer is 100%. Choices B, C, and D represent larger increases that exceed the speed necessary to meet the team's new goal.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?