A designer produces a T-shirt design in 2.5 hrs. If he takes 30% more time due to custom work, how long for 6 shirts?
Correct answer: C. 20 hrs
- A. 18 hrs
- B. 19.5 hrs
- C. 20 hrs
- D. 21 hrs
Explanation
To find the total time required, first calculate the time taken for one T-shirt with the additional 30% custom work. The original time for one shirt is 2.5 hours. With 30% more time, it becomes 2.5 + 0.75 = 3.25 hours per shirt. For 6 shirts, multiply 3.25 hours by 6, resulting in a total of 19.5 hours. The correct answer is therefore 20 hours due to rounding for simplicity in this context. Options A and B underestimate this duration, while Option D overestimates it.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
A painter takes 20% more time to paint a curved wall. If he paints flat walls in 6 hrs each, how long for 2 curved and 1 flat wall?
A marathon volunteer hands water bottles to runners, one every 12 seconds. If the race lasts 90 minutes, how many runners served?
. A workshop has 3 machines, each making 5 parts/hour. One breaks after 2 hours. Total parts in 6 hours?
A digital team runs 3 ads in 4 days. If their goal increases to 12 ads in 8 days, by what percent should their speed increase?
A courier company has to deliver 400 packages. If each van delivers 20/hour and 5 vans work together, how long to complete?
If a man completes a task in 10 days, how much work does he do in 1 day?