Which software project sizing approach develop estimates of the information domain characteristics ?
Correct answer: A. Function point sizing
- A. Function point sizing
- B. Change sizing
- C. Standard component sizing
- D. Fuzzy logic sizing
Explanation
Function point sizing estimates the software’s information-domain characteristics, such as inputs, outputs, inquiries, files, and interfaces. The other listed methods do not specifically perform this standard information-domain measurement.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Project Management
171 free Software Project Management MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Project Management questions
How many forms exists of Barry Boehm's COCOMO Model ?
If a Direct approach to software project sizing is taken, size can be measured in__________________?
The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
Why is decomposition technique required ?
Which of the following strategies means that the impact of the risk will be reduced ?
Which of the following risks are derived from the software or hardware technologies that are used to develop the system ?