How many stages are there in Risk-driven requirements specification ?

Correct answer: B. four

  • A. three
  • B. four
  • C. five
  • D. six

Explanation

Risk-driven requirements specification is commonly described in four stages, moving from identifying and analysing risks to reducing them and specifying the related requirements. The process uses risk analysis to focus requirements work on safety and dependability concerns.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

Practise Requirements Engineering

125 free Requirements Engineering MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Software Engineering questions like this

Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.

More Requirements Engineering questions