A mother is busy in cooking in the smoky kitchen but her baby is crying, what is true about it?
Correct answer: C. All of these
- A. The mother would be in the kitchen to take care of her baby
- B. The baby is also in the kitchen and requires some help
- C. All of these
- D. none of these
Explanation
We don't know if the baby is in the kitchen or not. Either way, if the baby is in any perceivable trouble, the mother would ideally prioritize taking care of her child rather than caring for the food. Hence, she wouldn't care if the food gets spoiled or not, so long as the baby needs her. If the child is in the kitchen, the mother may remove him/her from the vicinity of the smoke and check to see if the baby may need something else of her. If the baby is not in the kitchen, the mother would still go and check on the baby. Any of these scenarios are possible.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?