Which of the following is NOT a guideline for successfully conducting a Joint Requirements Planning (JRP) session ?
Correct answer: C. brainstorm technical alternatives to problems identified in a JRP session
- A. stay on schedule
- B. allow for ample breaks
- C. brainstorm technical alternatives to problems identified in a JRP session
- D. none of these
Explanation
A JRP session should remain focused on eliciting and agreeing on requirements, with a schedule and suitable breaks. Brainstorming technical solutions belongs to later design or decision analysis, not the requirements-planning session.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Requirements Engineering
125 free Requirements Engineering MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Requirements Engineering questions
All of the following are phases of systems analysis, except ?
Who are the people that actually use the system to perform or support the work to be completed ?
A ___________ process in any area of the business organization performs basic steps such as, receive input, measure, analyze, document, perform, process, record / store, access, produce and communicate?
The process of requirements discovery consists of the following activities, except_______________?