Which of the following is needed by Maintenance staff?

Correct answer: D. All of the mentioned

  • A. A specific type of equipment
  • B. Maintenance record for each and every equipment item
  • C. Check in/check out equipment for maintenance
  • D. All of the mentioned

Explanation

Maintenance staff need suitable equipment, a maintenance history for every item, and check-in/check-out control to track equipment during servicing. Since all three are required, the combined option is correct.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

Practise Software Project Management

171 free Software Project Management MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Software Engineering questions like this

Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.

More Software Project Management questions