Which of the following is(are) the inputs to the Systems Construction phase ?
Correct answer: D. all of the above
- A. design prototypes
- B. redesigned business processes
- C. physical design specifications
- D. all of the above
Explanation
Construction uses the physical design specifications, design prototypes, and redesigned business processes as inputs for building the system. Therefore, all three listed items apply.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Development Lifecycle
423 free Software Development Lifecycle MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Development Lifecycle questions
Mass production of computers started in ___________ , when UNIVAC 1 was delivered?
Optical character recognition ?
Information management model involves four steps ________ , _________ , _________ & ________ ?
The person generally responsible for the program design strategy, standards, and construction is called a(n) ?
Which of the following is a deliverable of the system implementation phase in a formal system development process ?
__________ development of DSS relies on the creation of a prototype and its progressive refinement?