What is the main function of a construction site layout plan?
Correct answer: D. To arrange temporary facilities and movement efficiently
- A. To determine the contractor's tax liability
- B. To establish the final market value of the property
- C. To certify the structural strength of completed work
- D. To arrange temporary facilities and movement efficiently
Explanation
A site layout plan positions offices, storage areas, access routes, plant, welfare facilities, and safety zones for efficient operations. It does not certify structural strength or determine taxation and property value.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? support@testustad.com
About Construction Management and Estimation
Construction management covers planning, scheduling, resource control, contracts, procurement, site organisation, safety, quality assurance and project documentation. Estimation includes quantity take-off, rate analysis, bill preparation, valuation and cost control, with attention to the difference between direct and indirect costs and between an estimate, a tender and a final account.
Practise Construction Management and Estimation
80 free Construction Management and Estimation MCQs from Civil Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Civil Engineering questions like this
Civil Engineering is on 3 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Construction Management and Estimation questions
Which measure is most effective for controlling a hazard before relying on personal protective equipment?
In a design and build procurement arrangement, who generally holds responsibility for both design and construction?
What is the principal purpose of an interim valuation on a construction project?
How is a contingency allowance in an estimate generally intended to be used?
What is the usual purpose of a variation order in a construction contract?
In construction cost control, what does a cost variance usually compare?