A worker can complete a task in 10 hours. How much of the task is completed in 4 hours?
Correct answer: C. ⅖ of the task
- A. ½ of the task
- B. ¾ of the task
- C. ⅖ of the task
- D. 2.5 of the task
Explanation
This is correct because if a worker completes 1/10 of the task in 1 hour, then in 4 hours, he completes 4/10 or ⅖ of the task.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
Work done is directly proportional to:
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
One pipe fills in 4 hours, another empties in 5. Net fill time = ?
If 4 men can complete a task in 6 days, how many men are required to complete the same task in 3 days?
A man can complete a task in 20 days by working 5 hours per day. How many hours per day must he work to finish it in 10 days?
A alone can do a job in 12 days, B in 18 days. How long will they take together?