Moderate

24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.

Correct answer: A. 24

  • A. 24
  • B. 30
  • C. 36
  • D. 48

Explanation

The correct answer is 24 days. If C completes the work in 12 days at a rate of 2 units per day, the total work is 24 units. A works at a rate of 1 unit per day, so A will take 24 days to complete the same amount of work. Other options like 30, 36, and 48 days either overestimate or underestimate the time needed based on A's work rate. Always calculate based on the unit rate of work done per day.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions