A team lays a 200-meter track in 10 days. Due to machinery failure, work pauses for 2 days. If efficiency drops by 10%, how many extra days are needed?

Correct answer: B. 3

  • A. 2
  • B. 3
  • C. 4
  • D. 5

Explanation

Initially, the team works for 8 days before the machinery failure, laying 160 meters of track (since 200 meters in 10 days means 20 meters per day). With 40 meters left and efficiency dropping by 10%, the team now lays 18 meters per day (90% of 20 meters). It will take approximately 2.22 days to complete the remaining work. Since they cannot work a fraction of a day, they would need 3 more days, making Option B correct. Options A, C, and D are incorrect as they either underestimate or overestimate the days needed after the efficiency drop.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions