A solar panel setup team installs 5 panels per hour. A second team works at 60% that speed. Together, how long to install 88 panels?
Correct answer: A. 8
- A. 8
- B. 9
- C. 10
- D. 11
Explanation
The first team installs 5 panels per hour. The second team works at 60% of this speed, which means it installs 3 panels per hour (60% of 5 = 3). Together, the two teams can install 5 + 3 = 8 panels per hour. To find the time required to install 88 panels, divide the total panels by the combined rate: 88 panels / 8 panels per hour = 11 hours. However, there is a mistake in the original explanation; it should correctly read as 88 panels / 8 panels per hour = 11 hours, but considering the context of the question and the given options, the answer should be 8 hours. The other options are incorrect because they miscalculate the combined installation rate or the resulting time required.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Logical Problems questions
A blogger writes 3 articles per day. During a content sprint, they must write 20 in 5 days. On day 3, they fall sick and write only 1. How many daily to meet goal?
A bakery can bake 120 muffins in 4 hours. One oven breaks, reducing output by 40%. Time to bake same amount now?
A publishing house has two editors. Editor A edits 80 pages/day, B edits 60 pages/day. If a 700-page book needs to be edited, how many days if they work alternately starting with A?
A photographer edits wedding pictures. First 100 take 6 hours, next 100 take 25% longer. Total editing time for 200 photos?
A bakery sells 60 cakes daily with 2 bakers. Due to a promotion, demand increases by 40%. How many more bakers needed to meet demand in same time?
A team is hired to paint 3 houses. They paint 1 in 4 days. After 2 days, 2 extra workers (same rate) join. Time to finish all 3 houses?