A sculptor needs to complete 6 statues in 24 days. After 12 days, only 1 statue is finished. To complete on time, how many assistants (equally efficient) are needed if each works like him?
Correct answer: C. 3
- A. 1
- B. 2
- C. 3
- D. 4
Explanation
Initially, the sculptor's work rate is 1/24 statues per day, as 6 statues need to be completed in 24 days. After 12 days, only 1 statue is finished, leaving 5 more statues to be completed in the remaining 12 days. This requires a new work rate of 5/12 statues per day. The sculptor alone can only work at a rate of 1/24 statues per day. To meet the new required rate, he needs assistants. By adding 3 assistants, each working at the same rate of 1/24 statues per day, the combined work rate becomes 4/24 or 1/6 statues per day per person, achieving the necessary 5/12 rate when summed up. Therefore, 3 assistants plus the sculptor meet the completion target, confirming Option C as correct. Options A and B do not meet the required work rate, while Option D represents excess resources.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?