Moderate

A freight company loads a truck in 4 hours with 2 loaders. A third loader joins after 1 hour. How long will it take to load completely?

Correct answer: B. 3.2 hrs

  • A. 3 hrs
  • B. 3.2 hrs
  • C. 3.5 hrs
  • D. 4 hrs

Explanation

The initial work rate with 2 loaders is 1 truck per 4 hours, or 1/4 of the truck per hour. After 1 hour, 1/4 of the truck is loaded. When the third loader joins, the work rate increases to 3 loaders, contributing 3/4 of the truck per hour. The remaining 3/4 of the truck is then completed in 1 hour (1/4 already done) plus 2.2 hours, totaling 3.2 hours. Option B reflects this calculation accurately. Options A and C are incorrect as they miscalculate the effect of the third loader, while Option D ignores the added help entirely.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions