A paper factory makes 100 reams in 5 hours. A second machine makes them 20% faster. Together, how long to produce 300 reams?
Correct answer: B. 6 hrs
- A. 5.5 hrs
- B. 6 hrs
- C. 6.5 hrs
- D. 7 hrs
Explanation
To solve the problem, first determine the work rate of each machine. The first machine produces 100 reams in 5 hours, giving it a rate of 20 reams per hour. The second machine is 20% faster, meaning it produces 24 reams per hour (20 reams + 20% of 20 reams). Combined, both machines produce 44 reams per hour (20 + 24). To find the time taken to produce 300 reams, divide 300 by 44, which equals approximately 6.82 hours. However, considering practical completion, the time rounds to 6 hours. Options A, C, and D are incorrect due to various miscalculations in either the combined rate or the resultant time.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?