Free Foreign Policy of Pakistan MCQs with Answers
235 Foreign Policy of Pakistan MCQs from Pakistan Studies, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.
Pakistan’s foreign policy covers its guiding principles, national interests, geographical position, security concerns and relations with neighbouring, Muslim and major world powers. It includes Pakistan’s roles in the United Nations, OIC, SAARC and regional alliances, as well as major issues involving India, Afghanistan, China, the United States and Kashmir.
Last updated
235 questions · page 3 of 12
- A. Inspired Gambit
- B. Druzhba 2016 OR (Friendship 2016)
- C. Operation Rajjgal
- D. North Thunder
Explanation: The first Pakistan-Russia joint military exercise in September 2016 was named Druzhba, meaning friendship in Russian. North Thunder was a separate multinational exercise, not the Pakistan-Russia exercise.
Correct answer: Druzhba 2016 OR (Friendship 2016)- A. Thunder Bolt
- B. Joint C-2016
- C. Inspired Gambit
- D. none of Above
Explanation: The Pakistan-US military exercise held in South Carolina in September 2016 was called Inspired Gambit. Druzhba was the Pakistan-Russia exercise conducted in the same period.
Correct answer: Inspired Gambit- A. Operation Zarb-e- Azab
- B. Operation Rah-e-Nijaat
- C. Operation Zarb-e-Ahaan
- D. Operation Rajjgal
Explanation: Operation Rajgal was conducted in the Rajgal Valley of Khyber Agency along the Pakistan-Afghanistan border. Zarb-e-Azb and Rah-e-Nijaat were separate operations in other areas and periods.
Correct answer: Operation Rajjgal- A. USA
- B. China
- C. Canada
- D. Turkey
Explanation: Pakistan’s fleet tanker PNS Moawin was built with Turkish assistance through cooperation between Pakistan’s Navy and Turkey. China, Canada and the United States were not the partners identified for this project.
Correct answer: Turkey- A. India
- B. Pakistan
- C. Afghanistan
- D. Syria
Explanation: Amnesty International closed its offices in India in the reported 2016 development, amid restrictions and pressure on its operations. The question refers to India, not Pakistan, Afghanistan or Syria.
Correct answer: India- A. Kidney Operation by qualified Surgeons
- B. A searching operation by Forces to find out hidden terrorists.
- C. A bill passed by Pakistani Parliament.
- D. None of Above
Explanation: A combing operation is a systematic search by security forces to locate hidden terrorists, weapons or suspects. It is a security term, not a medical operation or parliamentary action.
Correct answer: A searching operation by Forces to find out hidden terrorists.- A. $1 billion
- B. $3 billion
- C. $2 billion
- D. $4 billion
Explanation: Russia’s proposed investment in the Pakistan North-South gas pipeline was approximately $2 billion. The project was intended to strengthen Pakistan’s LNG transportation infrastructure.
Correct answer: $2 billion- A. 1,000 km
- B. 1,100 km
- C. 1,200 km
- D. 1,300 km
Explanation: The North-South gas pipeline was planned to run for about 1,100 kilometres between Karachi and Lahore. This route links LNG import facilities in the south with major consumers in Punjab.
Correct answer: 1,100 km- A. Karachi to Lahore
- B. Lahore to Karachi
- C. Gwadar to Karachi
- D. Gwadar to Sukkur
Explanation: The pipeline was planned to transport imported LNG from Karachi’s terminals towards Lahore. Therefore, its direction in this question is Karachi to Lahore.
Correct answer: Karachi to Lahore- A. 11.0
- B. 11.4
- C. 12.0
- D. 12.4
Explanation: The planned North-South pipeline capacity was about 12.4 billion cubic metres of gas annually. The figure refers to its expected annual transport capacity from Karachi to Lahore.
Correct answer: 12.4- A. $500 million
- B. $50 million
- C. $5 million
- D. $5000 million
Explanation: Pakistan issued a 10-year Eurobond worth $500 million on 25 September 2015. The million-dollar options below this amount are too small, while $5 billion is incorrect for that issue.
Correct answer: $500 million- A. 7.75%
- B. 8.0%
- C. 8.25%
- D. 8.50%
Explanation: The 10-year Eurobond issued in September 2015 carried an 8.25% coupon rate. The coupon is the fixed annual interest paid to bondholders.
Correct answer: 8.25%- A. 10 February 2016
- B. 16 February 2016
- C. 26 February 2016
- D. 20 February 2016
Explanation: Construction of Karachi’s Green Line bus project was inaugurated on 26 February 2016.
Correct answer: 26 February 2016- A. 11 January 2016
- B. 12 January 2016
- C. 13 January 2016
- D. 14 January 2016
Explanation: The Pakistan Stock Exchange was formed through the merger of the Karachi, Lahore and Islamabad stock exchanges on 11 January 2016. The extra label “South Asians & Diaspora” is unrelated scraping text.
Correct answer: 11 January 2016- A. Rs.15,085
- B. Rs.16,085
- C. Rs.17,085
- D. Rs.18,085
Explanation: The estimated cost of the Karachi Green Line project was Rs.16.085 billion. The options differ only in the first digit, making Rs.16,085 million the matching figure.
Correct answer: Rs.16,085- A. Kazakhstan
- B. Kyrgyzstan
- C. Turkmenistan
- D. Tajikistan
Explanation: TAPI stands for Turkmenistan-Afghanistan-Pakistan-India, so Turkmenistan is the gas-supplying country. The other Central Asian states listed are not part of the project’s name or supply route.
Correct answer: Turkmenistan57. The construction of TAPI gas pipeline began on 13 December 2015, and the expected completion date is
- A. December 2016
- B. December 2017
- C. December 2019
- D. December 2018
Explanation: When construction began in December 2015, the TAPI pipeline was expected to be completed by December 2018. Large cross-border energy projects often use such projected completion dates rather than actual finalisation dates.
Correct answer: December 2018- A. 10
- B. 12
- C. 14
- D. 16
Explanation: Pakistan’s planned share of TAPI gas was approximately 14 billion cubic metres per year, commonly cited as about 14.25 billion cubic metres. The figure is therefore rounded to 14 in the options.
Correct answer: 14- A. 9
- B. 10
- C. 15
- D. 20
Explanation: The Pakistan-Qatar LNG government-to-government agreement was reported as a 15-year contract. Its long-term structure was intended to secure a stable LNG supply for Pakistan.
Correct answer: 1560. According to the Pakistan-Qatar LNG deal Pakistan will receive ________million tons of LNG annually.
- A. 3.25
- B. 3.75
- C. 4.25
- D. 4.75
Explanation: Under the Qatar LNG agreement, Pakistan was to receive about 3.75 million tons of LNG annually. This quantity is distinct from the contract’s 15-year duration.
Correct answer: 3.75