All Free Pakistan Studies MCQs with Answers

مطالعہ پاکستان

Every Pakistan Studies question in the bank, across all chapters, each with the correct answer and a written explanation. Free and unlimited, with no account needed.

2,759 questions · page 128 of 138

Hard
  • A. A.V. Alexander
  • B. Cyril Radcliff
  • C. Sir Stafford Cripps
  • D. Lord Minto

Explanation: Cyril Radcliffe was appointed chairman of the boundary commissions and was responsible for drawing the partition boundary between India…

Correct answer: Cyril Radcliff
Moderate
  • A. 11 August 1947
  • B. 14 August 1948
  • C. 14 August 1947
  • D. None of these

Explanation: Mountbatten addressed Pakistan's Constituent Assembly in Karachi on 14 August 1947, the day Pakistan came into being.

Correct answer: 14 August 1947
Moderate
  • A. 3rd Jan 1947
  • B. 3rd Jan 1948
  • C. 3rd June 1948
  • D. 3rd June 1947

Explanation: The British transfer-of-power plan was announced by Lord Mountbatten on 3 June 1947 and is therefore known as the 3 June Plan.

Correct answer: 3rd June 1947
Easy
  • A. Durand Line
  • B. Radcliffe line
  • C. Line of control
  • D. None

Explanation: The Radcliffe Line marked the boundary drawn between the areas assigned to India and Pakistan at Partition in 1947.

Correct answer: Radcliffe line
Hard
  • A. 14 July 1947
  • B. 16 July 1947
  • C. 18 July 1947
  • D. 19 July 1947

Explanation: The Indian Independence Act received Royal Assent on 18 July 1947 and provided the legal basis for creating Pakistan and India.

Correct answer: 18 July 1947
Hard
  • A. Adorn Radcliffe
  • B. Cecil Radcliffe
  • C. Thomas Radcliffe
  • D. Cyril Radcliffe

Explanation: The Boundary Commission was headed by Sir Cyril Radcliffe, a British lawyer who had never previously visited India.

Correct answer: Cyril Radcliffe
Hard
  • A. Lake Manasarovar
  • B. Tibetan Lake
  • C. Tianchi Lake
  • D. None of these

Explanation: The Indus rises on the Tibetan Plateau near Lake Manasarovar and then flows northwest towards Ladakh and Pakistan.

Correct answer: Lake Manasarovar
Hard
  • A. 25.5 km
  • B. 16.8 km
  • C. 27.1 km
  • D. 50 km

Explanation: Lahore’s Orange Line Metro has a total route length of about 27.1 kilometres, including its elevated and underground sections.

Correct answer: 27.1 km
Moderate
  • A. Chenab
  • B. Jhelum
  • C. Indus
  • D. Ravi

Explanation: Diamer-Bhasha Dam is being constructed on the Indus River near the boundary of Gilgit-Baltistan and Khyber Pakhtunkhwa.

Correct answer: Indus
Very hard
  • A. 758 km
  • B. 1058 km
  • C. 1258 km
  • D. None of these

Explanation: Pakistan’s commonly cited coastline is about 1,046 km, or 650 miles, not 1,058 km.

Correct answer: None of these
Moderate
  • A. 570 miles(917Km)
  • B. 650 miles (1,046Km)
  • C. 700 miles(1126Km)
  • D. None of these

Explanation: Pakistan’s standard coastline measurement is approximately 1,046 km, equivalent to about 650 miles.

Correct answer: 650 miles (1,046Km)
Easy
  • A. Jhelum
  • B. Chenab
  • C. Indus
  • D. Ravi

Explanation: The Indus River flows near Moenjodaro and Larkana in Sindh. Jhelum, Chenab and Ravi are eastern or northern tributaries of the Indus…

Correct answer: Indus
Easy
  • A. Ravi
  • B. Jhelum
  • C. Chenab
  • D. Indus

Explanation: The Indus is the major river of Gilgit-Baltistan and passes through areas including Gilgit, Skardu and Diamer.

Correct answer: Indus
Moderate
  • A. Swat
  • B. Indus
  • C. Kabul
  • D. Panjkora

Explanation: Mohmand Dam is being constructed on the Swat River in Khyber Pakhtunkhwa.

Correct answer: Swat
Very hard
  • A. 340 megawatts
  • B. 360 megawatts
  • C. 400 megawatts
  • D. 150 megawatts

Explanation: Chashma Nuclear Power Plant Unit-3 has a generation capacity of 340 megawatts. It is part of the Chashma nuclear power complex in Mianwali.

Correct answer: 340 megawatts
Moderate
  • A. Canada
  • B. Turkey
  • C. Russia
  • D. China

Explanation: China assisted Pakistan in the construction of Chashma Nuclear Project-III, reflecting Sino-Pakistani cooperation in Pakistan’s nuclear…

Correct answer: China
Very hard
  • A. Kurram Tangi Dam Project
  • B. Kala Bagh Dam Project
  • C. Dia Mir Bahasha Dam Project
  • D. Mirani Dam Project

Explanation: The US agreement provided funding for the Kurram Tangi Dam Project in North Waziristan.

Correct answer: Kurram Tangi Dam Project
Moderate
  • A. 969 Mwt
  • B. 4500 Mwt
  • C. 425 Mgw
  • D. 3200 Mwt

Explanation: The Neelum-Jhelum Hydropower Plant near Muzaffarabad has an installed generation capacity of 969 MW.

Correct answer: 969 Mwt
Hard
  • A. 1,000 km
  • B. 1,152 km
  • C. 1,200 km
  • D. 1,300 km

Explanation: The Karachi-Lahore Motorway was commonly reported in project descriptions as approximately 1,152 kilometres long.

Correct answer: 1,152 km
Very hard
  • A. 10,000
  • B. 10,400
  • C. 10,800
  • D. 11,200

Explanation: The government’s target was to add about 10,400 MW of electricity-generation capacity to the national grid by 2017-18.

Correct answer: 10,400