- A. A.V. Alexander
- B. Cyril Radcliff
- C. Sir Stafford Cripps
- D. Lord Minto
Explanation: Cyril Radcliffe was appointed chairman of the boundary commissions and was responsible for drawing the partition boundary between India…
Correct answer: Cyril Radcliff2542. Lord Mountbatten, Governor General of India, addressed the Constituent Assembly of Pakistan on?
- A. 11 August 1947
- B. 14 August 1948
- C. 14 August 1947
- D. None of these
Explanation: Mountbatten addressed Pakistan's Constituent Assembly in Karachi on 14 August 1947, the day Pakistan came into being.
Correct answer: 14 August 1947- A. 3rd Jan 1947
- B. 3rd Jan 1948
- C. 3rd June 1948
- D. 3rd June 1947
Explanation: The British transfer-of-power plan was announced by Lord Mountbatten on 3 June 1947 and is therefore known as the 3 June Plan.
Correct answer: 3rd June 1947- A. Durand Line
- B. Radcliffe line
- C. Line of control
- D. None
Explanation: The Radcliffe Line marked the boundary drawn between the areas assigned to India and Pakistan at Partition in 1947.
Correct answer: Radcliffe line- A. 14 July 1947
- B. 16 July 1947
- C. 18 July 1947
- D. 19 July 1947
Explanation: The Indian Independence Act received Royal Assent on 18 July 1947 and provided the legal basis for creating Pakistan and India.
Correct answer: 18 July 1947- A. Adorn Radcliffe
- B. Cecil Radcliffe
- C. Thomas Radcliffe
- D. Cyril Radcliffe
Explanation: The Boundary Commission was headed by Sir Cyril Radcliffe, a British lawyer who had never previously visited India.
Correct answer: Cyril Radcliffe- A. Lake Manasarovar
- B. Tibetan Lake
- C. Tianchi Lake
- D. None of these
Explanation: The Indus rises on the Tibetan Plateau near Lake Manasarovar and then flows northwest towards Ladakh and Pakistan.
Correct answer: Lake Manasarovar- A. 25.5 km
- B. 16.8 km
- C. 27.1 km
- D. 50 km
Explanation: Lahore’s Orange Line Metro has a total route length of about 27.1 kilometres, including its elevated and underground sections.
Correct answer: 27.1 km- A. Chenab
- B. Jhelum
- C. Indus
- D. Ravi
Explanation: Diamer-Bhasha Dam is being constructed on the Indus River near the boundary of Gilgit-Baltistan and Khyber Pakhtunkhwa.
Correct answer: Indus- A. 758 km
- B. 1058 km
- C. 1258 km
- D. None of these
Explanation: Pakistan’s commonly cited coastline is about 1,046 km, or 650 miles, not 1,058 km.
Correct answer: None of these- A. 570 miles(917Km)
- B. 650 miles (1,046Km)
- C. 700 miles(1126Km)
- D. None of these
Explanation: Pakistan’s standard coastline measurement is approximately 1,046 km, equivalent to about 650 miles.
Correct answer: 650 miles (1,046Km)- A. Jhelum
- B. Chenab
- C. Indus
- D. Ravi
Explanation: The Indus River flows near Moenjodaro and Larkana in Sindh. Jhelum, Chenab and Ravi are eastern or northern tributaries of the Indus…
Correct answer: Indus- A. Ravi
- B. Jhelum
- C. Chenab
- D. Indus
Explanation: The Indus is the major river of Gilgit-Baltistan and passes through areas including Gilgit, Skardu and Diamer.
Correct answer: Indus- A. Swat
- B. Indus
- C. Kabul
- D. Panjkora
Explanation: Mohmand Dam is being constructed on the Swat River in Khyber Pakhtunkhwa.
Correct answer: Swat- A. 340 megawatts
- B. 360 megawatts
- C. 400 megawatts
- D. 150 megawatts
Explanation: Chashma Nuclear Power Plant Unit-3 has a generation capacity of 340 megawatts. It is part of the Chashma nuclear power complex in Mianwali.
Correct answer: 340 megawatts- A. Canada
- B. Turkey
- C. Russia
- D. China
Explanation: China assisted Pakistan in the construction of Chashma Nuclear Project-III, reflecting Sino-Pakistani cooperation in Pakistan’s nuclear…
Correct answer: China- A. Kurram Tangi Dam Project
- B. Kala Bagh Dam Project
- C. Dia Mir Bahasha Dam Project
- D. Mirani Dam Project
Explanation: The US agreement provided funding for the Kurram Tangi Dam Project in North Waziristan.
Correct answer: Kurram Tangi Dam Project- A. 969 Mwt
- B. 4500 Mwt
- C. 425 Mgw
- D. 3200 Mwt
Explanation: The Neelum-Jhelum Hydropower Plant near Muzaffarabad has an installed generation capacity of 969 MW.
Correct answer: 969 Mwt- A. 1,000 km
- B. 1,152 km
- C. 1,200 km
- D. 1,300 km
Explanation: The Karachi-Lahore Motorway was commonly reported in project descriptions as approximately 1,152 kilometres long.
Correct answer: 1,152 km- A. 10,000
- B. 10,400
- C. 10,800
- D. 11,200
Explanation: The government’s target was to add about 10,400 MW of electricity-generation capacity to the national grid by 2017-18.
Correct answer: 10,400