All Free Mathematics MCQs with Answers
Every Mathematics question in the bank, across all chapters, each with the correct answer and a written explanation. Free and unlimited, with no account needed.
1,551 questions · page 62 of 78
- A. 35 Rs.
- B. 40 Rs.
- C. 45 Rs.
- D. None of these
Explanation: A and B have rates 1/10 and 1/15 work per day, whose ratio is 3:2, so A deserves 3/5 of the wages. A's share is (3/5) × Rs.75 = Rs.45.
Correct answer: 45 Rs.- A. 30 days
- B. 25 days
- C. 24 days
- D. 20 days
Explanation: Equalising the total work gives 4(2m + 12w) = 5(4m + 6w), so 8m + 48w = 20m + 30w and m = 3w/2.
Correct answer: 24 days- A. 3/5
- B. 4/7
- C. 2/5
- D. 1/4
Explanation: Their combined rate is 1/15 + 1/12 = 3/20 work per day, so in 4 days they complete 4 × 3/20 = 3/5 of the work.
Correct answer: 2/5- A. 48
- B. 34(2/7)
- C. 44
- D. 45
Explanation: Using pairwise rates, 2A = (A+B) + (A+C) - (B+C) = 1/20 + 1/40 - 1/30 = 1/24 work per day, so A's rate is 1/48 work per day.
Correct answer: 48- A. 10
- B. 8
- C. 18
- D. 19
Explanation: The rate of all three together is [(1/30) + (1/24) + (1/20)] ÷ 2 = 1/16 work per day, so in 10 days they complete 5/8 and leave 3/8.
Correct answer: 18- A. 5 5⁄11
- B. 4 5⁄11
- C. 6 4⁄11
- D. 6 5⁄11
Explanation: A completes 12 days × 8 hours = 96 hours of work, so A's hourly rate is 1/96 work per hour; B's is 1/(8 × 10) = 1/80 work per hour.
Correct answer: 5 5⁄11- A. Rs. 380
- B. Rs. 600
- C. Rs. 420
- D. Rs. 400Educational Resources
Explanation: A and B together work at 1/6 + 1/8 = 7/24 of the job per day, so in 3 days they complete 21/24 = 7/8 and C completes the remaining 1/8.
Correct answer: Rs. 400Educational Resources- A. 5 hrs
- B. 10 hrs
- C. 15 hrs
- D. 20 hrs
Explanation: Let the slower pipe take t hours, so the faster takes t - 5 hours. Since together they fill 1/6 cistern per hour, 1/t + 1/(t - 5) = 1/6…
Correct answer: 15 hrs- A. 7.5 hrs
- B. 5 hrs
- C. 7 hrs
- D. None of these
Explanation: The net rate is 1/10 + 1/12 - 1/20 = 6/60 + 5/60 - 3/60 = 8/60 = 2/15 tank per hour.
Correct answer: 7.5 hrs- A. 42/4 days
- B. 41/4 days
- C. 55 days
- D. None of these
Explanation: In each two-day cycle, A and B complete 1/9 + 1/12 = 7/36 of the work. After four cycles, 28/36 = 7/9 is complete; A then works on day 9…
Correct answer: 41/4 days- A. 15 days
- B. 10 days
- C. 8 days
- D. 20 days
Explanation: The complete work rate of 4 men and 2 women is 1/2 work per day. Two men complete 1/5 work per day, so 4 men complete 2/5 work per day…
Correct answer: 10 days- A. 32 hours
- B. 48 hours
- C. 3 days
- D. 4 days
Explanation: If A works at x work per day, B works at 3x work per day, so together they work at 4x = 1 work per day.
Correct answer: 32 hours- A. 4(2/3) days
- B. 4 days
- C. 5(1/3) days
- D. 1(1/3) days
Explanation: The three pair rates are 1/6, 1/12 and 1/8 work per day. Their sum is 3/8 work per day, which counts each person's rate twice, so the…
Correct answer: 5(1/3) days- A. 6 days
- B. 10 days
- C. 15 days
- D. 20 days
Explanation: X completes 4 x 1/20 = 1/5 of the work in the first 4 days, leaving 4/5 of the work.
Correct answer: 10 days- A. 3 : 4
- B. 4 : 3
- C. 5 : 3
- D. Data inadequate
Explanation: The same work equals 20 women x 16 days = 320 woman-days and 16 men x 15 days = 240 man-days.
Correct answer: 4 : 3- A. 80 days
- B. 100 days
- C. 120 days
- D. 150 days
Explanation: Using pair rates, A's rate is (AB + AC - BC)/2 = (1/72 + 1/90 - 1/120)/2 = (1/60)/2 = 1/120 work per day.
Correct answer: 120 days- A. 8 days
- B. 10 days
- C. 12 days
- D. 15 days
Explanation: Together A and B complete 1/15 + 1/10 = 1/6 work per day, so in 2 days they complete 1/3 of the work.
Correct answer: 12 days- A. 15 days
- B. 20 days
- C. 25 days
- D. 30 days
Explanation: The condition says A's rate equals B plus C's rate. Since A and B together work at 1/10 work per day and C works at 1/50 work per day…
Correct answer: 25 days- A. 160
- B. 175
- C. 180
- D. 195
Explanation: A regular four-week schedule has 5 x 8 x 4 = 160 regular hours, earning 160 x Rs. 2.40 = Rs. 384. The remaining Rs. 432 - Rs. 384 = Rs.
Correct answer: 175- A. 3
- B. 4
- C. 5
- D. 6
Explanation: The loss in wages equals the number of absent days multiplied by the daily wage: Rs. 4956 - Rs. 3894 = Rs. 1062. The daily wage is Rs.
Correct answer: 3