All Free Electrical Engineering MCQs with Answers

Every Electrical Engineering question in the bank, across all chapters, each with the correct answer and a written explanation. Free and unlimited, with no account needed.

3,143 questions · page 147 of 158

  • A. Exhaust fan
  • B. Lathe machine
  • C. Welding transformer
  • D. All of the above

Explanation: A welding transformer produces a fluctuating load because the welding arc is repeatedly struck, interrupted, and varied during operation.

Correct answer: Welding transformer
  • A. peak load plant
  • B. base load plant
  • C. stand-by plant
  • D. spinning reserve plant
  • E. any of the above

Explanation: Nuclear stations are designed for continuous operation because their fuel and operating characteristics favour steady generation rather…

Correct answer: base load plant
  • A. sinking fund depreciation
  • B. straight line depreciation
  • C. reducing balances depreciation
  • D. none of the above

Explanation: In the sinking-fund method, interest earned on earlier deposits contributes to the required depreciation fund, so the annual deposit…

Correct answer: sinking fund depreciation
  • A. fixed charges
  • B. semi-fixed charges
  • C. running charges
  • D. all of the above

Explanation: The annual cost of operating a power plant is divided into fixed charges, semi-fixed charges, and running charges.

Correct answer: all of the above
  • A. equal to unity
  • B. less than unity
  • C. more than unity
  • D. none of the above

Explanation: Utilization factor is the ratio of maximum demand to the plant's rated capacity.

Correct answer: more than unity
  • A. nuclear power plant
  • B. hydro power plant
  • C. diesel power plant
  • D. both B and C
  • E. none of the above

Explanation: Diesel and hydroelectric plants can be brought into service very quickly, unlike nuclear plants, which require lengthy starting and…

Correct answer: both B and C
  • A. diesel engine
  • B. hydraulic turbine
  • C. gas turbine
  • D. steam turbine
  • E. any of the above

Explanation: Generating stations may use diesel engines, hydraulic turbines, gas turbines, or steam turbines as their prime movers, depending on the…

Correct answer: any of the above
  • A. dependent upon the energy consumed
  • B. dependent upon the maximum demand of the consumer
  • C. both A and B
  • D. neither A nor B

Explanation: In a two-part or Hopkinson tariff, the demand charge is based on the consumer's maximum demand, usually measured in kW or kVA.

Correct answer: dependent upon the maximum demand of the consumer
  • A. the capital cost divided by number of year of life
  • B. the capital cost minus the salvage value, is divided by the number of years of life
  • C. increasing a uniform sum of money per annum at stipulated rate of interest
  • D. none of the above

Explanation: Straight-line depreciation spreads the depreciable amount uniformly over the plant life.

Correct answer: the capital cost minus the salvage value, is divided by the number of years of life
  • A. thermal plant
  • B. diesel plant
  • C. hydroelectric plant
  • D. none of these

Explanation: Thermal plants generally have high depreciation charges because their equipment operates at high temperatures and pressures and their…

Correct answer: thermal plant
  • A. sinking fund method
  • B. straight line method
  • C. both A. and B.
  • D. none of the above

Explanation: Both the straight-line and sinking-fund methods are used to calculate annual depreciation.

Correct answer: both A. and B.
  • A. load survey method
  • B. statistical methods
  • C. mathematical method
  • D. economic parameters
  • E. all of the above

Explanation: Demand can be estimated from consumer load surveys, statistical and mathematical analysis, and economic indicators.

Correct answer: all of the above
  • A. the greatest of all "short time interval averaged" demand during a period
  • B. instantaneous maximum value of kVA supplied during a period
  • C. both A. or B.
  • D. none of the above

Explanation: Maximum demand is the highest average load recorded over a specified short interval during the period.

Correct answer: the greatest of all "short time interval averaged" demand during a period
  • A. less number of consumers
  • B. more number of consumers
  • C. neither A. nor B.
  • D. either A. or B.

Explanation: A high diversity factor means consumers reach their individual peaks at different times, so their combined station demand is lower.

Correct answer: more number of consumers
  • A. Solar power plant
  • B. Tidal power plant
  • C. Wind power plant
  • D. Any of the above

Explanation: Solar, wind, and tidal generation depend on naturally occurring conditions and cannot be dispatched freely whenever demand requires.

Correct answer: Any of the above
  • A. Fuel cost
  • B. Interest on capital
  • C. Depreciation
  • D. Insurance charges

Explanation: Fuel expense changes with the amount of energy generated, so it is a running or variable cost.

Correct answer: Fuel cost
  • A. nuclear power plants
  • B. diesel generating plants
  • C. steam power stations
  • D. None

Explanation: Nuclear fuel contains very high energy per unit mass, so only a small quantity must be transported for large energy production.

Correct answer: nuclear power plants
  • A. Fuel cost
  • B. Interest on capital
  • C. Insurance charges
  • D. Depreciation

Explanation: Fuel cost varies with plant operation and energy generation, making it a variable cost.

Correct answer: Fuel cost
  • A. Nuclear power plant
  • B. Hydro-electric power plants
  • C. Thermal power plants
  • D. Diesel engine power plants

Explanation: Thermal plants contain boilers, turbines, coal-handling systems and auxiliaries that require frequent servicing, so their maintenance cost…

Correct answer: Thermal power plants
  • A. Maintenance cost
  • B. Fuel cost
  • C. Salaries of high officials
  • D. Salaries of operating staff

Explanation: Fuel, operating-staff salaries and maintenance are directly associated with running a plant.

Correct answer: Salaries of high officials