1231. When the PM of Pakistan laid down the Foundation of Mohmand Dam?

  • A. 2nd May 2019
  • B. 1st May 2019
  • C. 3rd May 2019
  • D. 30th April 2019

Explanation: Prime Minister Imran Khan performed the foundation-laying ceremony for Mohmand Dam on 2 May 2019. The ceremony marked the formal start of construction after prolonged planning and financing efforts.

Correct answer: 2nd May 2019

1232. Who laid down the foundation of Mohmand Hydro power Project Dam?

  • A. PM Imran Khan
  • B. Ex( CJ ) Saqib Nisar
  • C. President Arif Alvi
  • D. Omer Ayub Khan

Explanation: Prime Minister Imran Khan laid the foundation of the Mohmand Hydro Power Project Dam. Former Chief Justice Saqib Nisar had helped mobilise public support and funds for dams but did not lay this foundation.

Correct answer: PM Imran Khan

1233. Pakistan and China have signed an agreement for __________railway track on 28th April, 2019.

  • A. Pak-China Express Train
  • B. ML-1
  • C. MS-5
  • D. PC-1

Explanation: The agreement concerned the Main Line-1, or ML-1, railway upgrade linking Peshawar with Karachi. ML-1 is the largest railway infrastructure component associated with CPEC's transport programme.

Correct answer: ML-1

1234. How much loan World Bank has granted to Pakistan for building Khyber Pass Economic Corridor?

  • A. $460.6 Million
  • B. US$410.6 Million
  • C. US$420.6 Million
  • D. US$440.6 Million

Explanation: The World Bank approved a $460.6 million loan for the Khyber Pass Economic Corridor, a CPEC-linked road project connecting Peshawar with Afghanistan. The $410.6 million figure is a tempting but incorrect alternative.

Correct answer: $460.6 Million

1235. Gojra Shorkot Section Motorway is a _________?

  • A. 4 Lane Motorway
  • B. 6 Lane Motorway
  • C. 2 Lane Motorway
  • D. None of the above

Explanation: The Gojra-Shorkot section was built as a four-lane motorway under the M-4 project. It was not a six-lane or two-lane section.

Correct answer: 4 Lane Motorway

1236. Gojra Shorkot section Motorway Project under CPEC is of how many Kilometers ?

  • A. 61 Km
  • B. 81 Km
  • C. 91 Km
  • D. None of the Above

Explanation: The Gojra-Shorkot motorway section is approximately 61 kilometres long. The 81 km and 91 km figures refer to other road-project measurements, not this section.

Correct answer: 61 Km

1237. Who is the Current Chairman of Parliamentary Panel on CPEC?

  • A. Mehnaz akbar aziz
  • B. Sohail mehmmod
  • C. Sher ali arbab
  • D. Aziz ahmed chaudary

Explanation: Sher Ali Arbab chaired the parliamentary panel on CPEC during the period referenced by the question. Mehnaz Akbar Aziz and the other listed figures did not hold this chairmanship.

Correct answer: Sher ali arbab

1238. Saudi Arabia will establish oil refinery at Gawadar at the cost of_____________?

  • A. $8 Billion
  • B. $9 Billion
  • C. $10 Billion
  • D. $11 Billion

Explanation: Saudi Arabia’s proposed Gwadar oil refinery was valued at approximately $10 billion. This was one of the major Saudi investment projects linked with Gwadar and Pakistan’s broader development plans.

Correct answer: $10 Billion

1239. PPP Chairman Bilawal Bhutto Zardari inaugurated Tharcoal power project on____________?

  • A. 10th April 2019
  • B. 9th April 2019
  • C. 8th April 2019
  • D. 7th April 2019

Explanation: Bilawal Bhutto Zardari inaugurated the Thar coal power project on 10 April 2019. The date distinguishes the event from the three preceding options.

Correct answer: 10th April 2019

1240. Total installed capacity of Quaid-e-Azam Solar Park Bahawalpur will be___________?

  • A. 300 Mega Watt
  • B. 600 Mega Watt
  • C. 1000 Mega Watt
  • D. 1200 Mega watt

Explanation: The planned total installed capacity of the Quaid-e-Azam Solar Park in Bahawalpur was 1,000 megawatts. Its large capacity made it one of Pakistan’s flagship renewable-energy projects.

Correct answer: 1000 Mega Watt