Which two models doesn't allow defining requirements early in the cycle?
Correct answer: B. Prototyping & Spiral
- A. Waterfall & RAD
- B. Prototyping & Spiral
- C. Prototyping & RAD
- D. Waterfall & Spiral
Explanation
Prototyping and Spiral models are intended for situations where requirements are uncertain and are refined during development rather than fully fixed at the beginning. Waterfall, in contrast, expects early requirements definition.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Development Lifecycle
423 free Software Development Lifecycle MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Development Lifecycle questions
RUP stands for______________ created by a division of ______________?
The Incremental Model is a result of combination of elements of which two models?
The spiral model has two dimensions namely _______________ and _______________?
Arrange the following activities for making a software product using 4GT. i. Design strategy ii. Transformation into product iii. Implementation iv. Requirement gathering ?
The 4GT Model is a package of _________________?
4GL is an example of ________________ processing?