Which model is used during early stages of the system design after the requirements have been established ?
Correct answer: D. An early design model
- A. An application-composition model
- B. A post-architecture model
- C. A reuse model
- D. An early design model
Explanation
The early design model is applied after requirements are established but before the system architecture is fully defined. The post-architecture model requires a more detailed architectural design.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Project Management
171 free Software Project Management MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Project Management questions
Which model assumes that systems are created from reusable components, scripting or database programming ?
Estimation of size for a project is dependent on___________________?
Which one is not a size measure for software product ?
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
Which of the following states that work expands to fill the time available ?
Which technique is applicable when other projects in the same analogy application domain have been completed ?