What is Life cycle risk assessment ?
Correct answer: C. All of the mentioned
- A. Risk assessment before the system has been deployed
- B. Risk assessment while the system is being developed
- C. All of the mentioned
- D. None of the mentioned
Explanation
Life-cycle risk assessment is performed across the system's development and operational life, including before deployment and while the system is being developed. Thus both listed stages are covered by “all of the mentioned.”
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Development Lifecycle
423 free Software Development Lifecycle MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Development Lifecycle questions
Which is the first step in the software development life cycle ?
Actual programming of software code is done during the __________________ step in the SDLC?
_______________ is the process of translating a task into a series of commands that a computer will use to perform that task ?
In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
CMM stands for_____________________?
The Capability Maturity Model (CMM) is a continuous model ?