Most of the high transmission lines in Pakistan are_______________?
Correct answer: B. overhead
- A. underground
- B. overhead
- C. either of the above
- D. none of the above
Explanation
Most high-voltage transmission lines in Pakistan are overhead because overhead construction is much cheaper and easier to inspect and repair than underground construction. Underground lines are used mainly where space or appearance is critical.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Power Systems
334 free Power Systems MCQs from Electrical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Electrical Engineering questions like this
Electrical Engineering is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Power Systems questions
The distributors for residential areas are______________?
High voltage transmission lines use__________________?
The loads on distributors systems are generally__________________?
Which of the following D.C. distribution system is the simplest and lowest in first cost ?
The operating voltage of extra high tension cables is upto_______________?
The operating voltage of supertension cables is up to_________________?